Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MSHA CONTROLLER IDM08888
MINE PORTFOLIO
18 of 18 mines and facilities
2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
Portfolio map
16 of 18 mines with usable MSHA coordinates. Select a marker to open a mine.
Database snapshot · 2026-10-17. All 18 mines listed under this controller were checked; 0 have reports in the available quarters. Totals use current ownership.
Coal production
—
reported short tons
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Hours worked
—
reported employee hours
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Tons per hour
—
production ÷ hours worked
2025 Q1—No usable value reported
2025 Q2—No usable value reported
2025 Q3—No usable value reported
2025 Q4—No usable value reported
2026 Q1—No usable value reported
2026 Q2—No usable value reported
2026 Q3—No usable value reported
2026 Q4 *—No usable value reported
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
Quarterly production, employment and reporting coverage for John H Waters
Quarter
Coal (short tons)
Hours worked
Tons / hour
Avg. employees
Coverage
2025 Q1
—
—
—
—
No report
2025 Q2
—
—
—
—
No report
2025 Q3
—
—
—
—
No report
2025 Q4
—
—
—
—
No report
2026 Q1
—
—
—
—
No report
2026 Q2
—
—
—
—
No report
2026 Q3
—
—
—
—
No report
2026 Q4
—
—
—
—
No report
Safety and enforcement
2025-01-01 – 2026-10-17
Violations
152
17 significant & substantial (S&S)
2025 Q124
2025 Q236
2025 Q313
2025 Q414
2026 Q123
2026 Q228
2026 Q314
2026 Q4 *0
Accident records
14
0 records classified as fatality
2025 Q12
2025 Q21
2025 Q32
2025 Q44
2026 Q10
2026 Q22
2026 Q33
2026 Q4 *0
Proposed penalties · USD
72,176.00
152 of 152 violations with amounts
2025 Q19,971
2025 Q211,361
2025 Q35,213
2025 Q42,790
2026 Q128,009
2026 Q211,508
2026 Q33,324
2026 Q4 *—
On-site inspection hours
641.75
55 inspections · 55 with hours
2025 Q197.00
2025 Q2105.25
2025 Q390.50
2025 Q462.50
2026 Q1101.00
2026 Q2129.50
2026 Q356.00
2026 Q4 *—
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
Quarter
Violations
S&S
Proposed USD
Accident records
Fatality records
Inspections
On-site hours
2025-Q1
24
3
9,971.00
2
0
9
97.0
2025-Q2
36
2
11,361.00
1
0
7
105.3
2025-Q3
13
3
5,213.00
2
0
9
90.5
2025-Q4
14
2
2,790.00
4
0
7
62.5
2026-Q1
23
4
28,009.00
0
0
9
101.0
2026-Q2
28
1
11,508.00
2
0
10
129.5
2026-Q3
14
2
3,324.00
3
0
4
56.0
2026-Q4 *
0
0
—
0
0
0
—
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee operating front loader noticed rebar protruding from the ground. Employee exited loader and attempted to physically remove rebar from ground by hand. Employee was struck in the mouth when rebar came loose from the ground.
Employee was cutting a hole in a steel plate sitting on top of a 4' pipe under awning of maintenance shop. EE stopped momentarily to answer EE's phone, then proceeded to attempt to re-ignite Oxygen/Acetylene torch using heat from plate. Gas that had built up in 4' Pipe then ignited causing a loud pop. Employee was not wearing hearing protection at the time of the incident.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
4 linked operators.
Relationships reflect the selected mine status and current MSHA controller/operator fields.