ALL STATUSES / CONTROLLER PORTFOLIO

Jody Dale Puckett

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0069491

MINE PORTFOLIO

14 of 14 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
680-S11519977 · Active4/8 quarters reportedFloyd, KYSurface · MSHA: Coal (Bituminous)59,32242,749381486.0
Newman Branch S11519951 · Active6/8 quarters reportedFloyd, KYSurface · MSHA: Coal (Bituminous)118,55220,730240279.3
SPURLOCK PLANT1515978 · Active6/8 quarters reportedFloyd, KYFacility · MSHA: Coal (Bituminous)076,954641723.3
UG #11519242 · Active6/8 quarters reportedFloyd, KYUnderground · MSHA: Coal (Bituminous)3,90027,153531711.8
#11519042 · AbandonedKnott, KYUnderground · MSHA: Coal (Bituminous)——00—
#101519294 · Abandoned and SealedFloyd, KYUnderground · MSHA: Coal (Bituminous)——00—
#121518888 · AbandonedFloyd, KYFacility · MSHA: Coal (Bituminous)——00—
#21519261 · Abandoned and SealedKnott, KYUnderground · MSHA: Coal (Bituminous)——00—
#31519378 · AbandonedFloyd, KYSurface · MSHA: Coal (Bituminous)——00—
680-S21519990 · New MineFloyd, KYSurface · Not reported——00—
#71519390 · AbandonedPike, KYUnderground · MSHA: Coal (Bituminous)——00—
Bear Branch Refuse1518992 · AbandonedPike, KYSurface · MSHA: Coal (Bituminous)——00—
Newman Branch S21519982 · Abandoned2/8 quarters reportedFloyd, KYSurface · MSHA: Coal (Bituminous)03,44490108.5
Viper Coal LLC 6#1519253 · Abandoned and SealedFloyd, KYUnderground · MSHA: Coal (Bituminous)——00—

LOCATION

Portfolio map

13 of 14 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

188

40 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q231
  3. 2025 Q318
  4. 2025 Q436
  5. 2026 Q117
  6. 2026 Q252
  7. 2026 Q320
  8. 2026 Q4 *14

Accident records

3

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

39,029.00

156 of 188 violations with amounts

  1. 2025 Q1—
  2. 2025 Q23,551
  3. 2025 Q311,309
  4. 2025 Q47,734
  5. 2026 Q14,875
  6. 2026 Q28,564
  7. 2026 Q32,996
  8. 2026 Q4 *—

On-site inspection hours

2,308.75

57 inspections · 57 with hours

  1. 2025 Q176.75
  2. 2025 Q2677.75
  3. 2025 Q3105.75
  4. 2025 Q4465.00
  5. 2026 Q1253.25
  6. 2026 Q2463.75
  7. 2026 Q3198.75
  8. 2026 Q4 *67.75
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—00376.8
2025-Q23133,551.001013677.8
2025-Q3181011,309.00005105.8
2025-Q43647,734.00106465.0
2026-Q117114,875.000010253.3
2026-Q25268,564.00008463.8
2026-Q32042,996.001010198.8
2026-Q4 *142—00267.8

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9778176
    680-S1 · 1519977

    77.1104 · $151.00 proposed

  2. violation9778175
    680-S1 · 1519977

    77.410(c) · $151.00 proposed

  3. inspection7046684
    680-S1 · 1519977

    Regular Safety and Health Inspection · 155.8 on-site hours

  4. accident220251760003
    SPURLOCK PLANT · 1515978

    POWERED HAULAGE · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    The employee was going down the hill to dump the truck so that EE could do repairs on it. As employee was going down the hill EE lost control and was thrown from the truck.

  5. inspectionF00CF91
    SPURLOCK PLANT · 1515978

    Non-Fatal Accident Investigation · 169.3 on-site hours

  6. violation9773908
    SPURLOCK PLANT · 1515978

    Description not reported

  7. violation9774121
    Newman Branch S1 · 1519951

    77.502 · $151.00 proposed

  8. violation9774120
    Newman Branch S1 · 1519951

    77.506-1 · $151.00 proposed

  9. violation9774119
    Newman Branch S1 · 1519951

    77.502 · $151.00 proposed

  10. violation9774118
    Newman Branch S1 · 1519951

    77.1104 · $151.00 proposed

  11. violation9774117
    Newman Branch S1 · 1519951

    77.1104 · $151.00 proposed

  12. inspectionF000647
    Newman Branch S1 · 1519951

    Spot Inspection · 24.3 on-site hours

  13. violation9778168
    SPURLOCK PLANT · 1515978

    77.1110 · $151.00 proposed

  14. violation9778167
    SPURLOCK PLANT · 1515978

    77.1110 · $151.00 proposed

  15. violation9778166
    SPURLOCK PLANT · 1515978

    77.1104 · $151.00 proposed

  16. violation9778164
    SPURLOCK PLANT · 1515978

    77.1606(a) · S&S · $177.00 proposed

  17. violation9778163
    SPURLOCK PLANT · 1515978

    77.1104 · S&S · $177.00 proposed

  18. violation9778162
    SPURLOCK PLANT · 1515978

    77.1109(c)(1) · S&S · $177.00 proposed

  19. violation9778161
    SPURLOCK PLANT · 1515978

    77.1104 · $151.00 proposed

  20. violation9778160
    SPURLOCK PLANT · 1515978

    77.1606(c) · $151.00 proposed

  21. inspectionF0049A9
    UG #1 · 1519242

    Non-Injury Accident Investigation · 3.3 on-site hours

  22. inspectionF0049A8
    UG #1 · 1519242

    Non-Injury Accident Investigation · 3.3 on-site hours

  23. inspectionF0049A5
    UG #1 · 1519242

    Non-Injury Accident Investigation · 1.3 on-site hours

  24. inspectionF0049A3
    UG #1 · 1519242

    Non-Injury Accident Investigation · 1.3 on-site hours

  25. inspectionF0049A4
    UG #1 · 1519242

    Non-Injury Accident Investigation · 1.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS182,68512 rows · 3 receiving plants
HEAT CONTENT · BTU/LB12,692Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.95 / 7.74Separate averages over measured receipts
DELIVERED COST · USD/TON113.93100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q412,84612,8250.826.00110.71
2026-Q169,17212,7971.087.67114.90
2026-Q290,49812,6380.887.80113.90
2026-Q3 *10,16912,2850.8910.00111.77
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11577 · preliminaryNewman Branch S11519951Cooper1384 · KY · CARBON PARTNERS, INC .10,169111.7712,2850.8910.00SpotBITTruck
2026-06EIA row 9561 · preliminaryNEWMAN BRANCH1519951Bowen703 · GA · CARBON/ELK HORN RESOURCES13,025112.2712,0671.0411.20SpotBITRail
2026-06EIA row 9965 · preliminaryMARTIN PLANT1515978Wateree3297 · SC · CARBON PARTNERS, INC .12,929112.2012,6300.887.60SpotBITRail
2026-05EIA row 7755 · preliminaryNEWMAN BRANCH1519951Bowen703 · GA · CARBON/ELK HORN RESOURCES13,026119.2112,8600.826.10SpotBITRail
2026-05EIA row 8119 · preliminaryMARTIN PLANT1515978Wateree3297 · SC · CARBON PARTNERS, INC .25,531113.7613,0100.895.50SpotBITRail
2026-04EIA row 5933 · preliminaryNEWMAN BRANCH1519951Bowen703 · GA · CARBON/ELK HORN RESOURCES25,987113.0212,4530.829.30SpotBITRail
2026-03EIA row 4095 · preliminaryNEWMAN BRANCH1519951Bowen703 · GA · CARBON/ELK HORN RESOURCES12,942119.7912,8450.905.80SpotBITRail
2026-03EIA row 4240 · preliminaryNewman Branch S11519951Cooper1384 · KY · CARBON PARTNERS, INC .10,052114.8212,4801.1510.40SpotBITTruck
2026-02EIA row 2142 · preliminaryNEWMAN BRANCH1519951Bowen703 · GA · CARBON/ELK HORN RESOURCES12,966112.2712,5860.967.70SpotBITRail
2026-02EIA row 2255 · preliminaryNewman Branch S11519951Cooper1384 · KY · CARBON PARTNERS, INC .10,167117.7612,8001.139.50SpotBITTruck
2026-01EIA row 557 · preliminaryMARTIN PLANT1515978Wateree3297 · SC · CARBON PARTNERS, INC .23,045112.4113,0251.206.70SpotBITRail
2025-11EIA row 30948 · finalNEWMAN BRANCH1519951Bowen703 · GA · CARBON PARTNERS INC12,846110.7112,8250.826.00SpotBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Spurlock Plant1515978 · Floyd, Kentucky0———Preparation plant1 eligible mines / 1 sales respondents
#121518888 · Location unavailable————No matching annual production record
Bear Branch Refuse1518992 · Location unavailable————No matching annual production record
#11519042 · Location unavailable————No matching annual production record
UG #11519242 · Location unavailable————No matching annual production record
Viper Coal LLC 6#1519253 · Location unavailable————No matching annual production record
#21519261 · Location unavailable————No matching annual production record
#101519294 · Location unavailable————No matching annual production record
#31519378 · Location unavailable————No matching annual production record
#71519390 · Location unavailable————No matching annual production record
Newman Branch S11519951 · Floyd, Kentucky20,492———Below EIA sales-reporting threshold1 eligible mines / 1 sales respondents
680-S11519977 · Location unavailable————No matching annual production record
Newman Branch S21519982 · Location unavailable————No matching annual production record
680-S21519990 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

2 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.