Jerry Todd Tackett safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
AUS #1 · 151984730 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
AUS #1 · 151984730 CFR 75.1103-8(c) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
AUS #1 · 151984730 CFR 75.512 · $465.00 proposed penalty
Accumulation of combustible materials.
AUS #1 · 151984730 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
AUS #1 · 151984730 CFR 75.512 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
AUS #1 · 151984730 CFR 75.370(a)(1) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
AUS #1 · 151984730 CFR 70.208(a)(2) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
AUS #1 · 151984730 CFR 70.208(a)(1) · $151.00 proposed penalty
Rock dusting.
AUS #1 · 151984730 CFR 75.402 · $818.00 proposed penalty
Roof control plan.
AUS #1 · 151984730 CFR 75.220(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
AUS #1 · 151984730 CFR 75.370(a)(1) · $151.00 proposed penalty
Violation — cited standard not reported
AUS #1 · 1519847$273.00 proposed penalty
Escapeways; bituminous and lignite mines.
AUS #1 · 151984730 CFR 75.380(d)(7)(i) · $818.00 proposed penalty
Escapeways; bituminous and lignite mines.
AUS #1 · 151984730 CFR 75.380(d)(7)(vi) · $245.00 proposed penalty
Ventilation controls.
AUS #1 · 151984730 CFR 75.333(h) · $209.00 proposed penalty
Storage of materials.
AUS #1 · 151984730 CFR 77.208(d) · $151.00 proposed penalty
Escapeway maps.
AUS #1 · 151984730 CFR 75.1505(b) · $209.00 proposed penalty
Preshift examination at fixed intervals.
AUS #1 · 151984730 CFR 75.360(g) · $151.00 proposed penalty
Regular Safety and Health Inspection
AUS #1 · 1519847261.8 on-site hours reported
Spot Inspection
AUS #1 · 15198473.0 on-site hours reported
Mine ventilation plan; submission and approval.
AUS #1 · 151984730 CFR 75.370(a)(1) · $1,320.00 proposed penalty
Quarterly sampling; mechanized mining units.
AUS #1 · 151984730 CFR 70.208(a)(1) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
AUS #1 · 151984730 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
AUS #1 · 151984730 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
AUS #1 · 151984730 CFR 75.403 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.