Jerry Todd Tackett safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Mine #2 · 151926930 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
Mine #2 · 151926930 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mine #2 · 151926930 CFR 75.512 · Significant and substantial (S&S) · $151.00 proposed penalty
Roof control plan.
Mine #2 · 151926930 CFR 75.220(a)(1) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
Mine #2 · 151926930 CFR 70.208(a)(2) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
AUS #1 · 151984730 CFR 70.208(a)(1) · $151.00 proposed penalty
Preshift examination at fixed intervals.
Mine #2 · 151926930 CFR 75.360(g) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
AUS #1 · 151984730 CFR 75.503 · $151.00 proposed penalty
Regular Safety and Health Inspection
Mine #2 · 1519269134.5 on-site hours reported
Regular Safety and Health Inspection
AUS #1 · 1519847216.3 on-site hours reported
Spot Inspection
AUS #1 · 15198473.3 on-site hours reported
Automatic fire warning devices; actions and response.
Mine #2 · 151926930 CFR 75.1103-5(a)(1) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
AUS #1 · 151984730 CFR 77.404(a) · Significant and substantial (S&S) · $193.00 proposed penalty
Machinery and equipment; operation and maintenance.
AUS #1 · 151984730 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Loading and haulage equipment; installations.
AUS #1 · 151984730 CFR 77.1605(d) · $151.00 proposed penalty
Action level.
Mine #2 · 151926930 CFR 62.120 · $151.00 proposed penalty
Mechanical equipment guards.
AUS #1 · 151984730 CFR 75.1722(c) · $151.00 proposed penalty
Accumulation of combustible materials.
AUS #1 · 151984730 CFR 75.400 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
AUS #1 · 151984730 CFR 75.1100-3 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
AUS #1 · 151984730 CFR 72.630(b) · $151.00 proposed penalty
Accumulation of combustible materials.
AUS #1 · 151984730 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mine #2 · 151926930 CFR 75.512 · $151.00 proposed penalty
Loading and haulage equipment; installations.
AUS #1 · 151984730 CFR 77.1605(d) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
AUS #1 · 151984730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
AUS #1 · 151984730 CFR 75.370(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.