← Jerry Todd Tackett

Jerry Todd Tackett safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0102C2
    AUS #1 · 1519847

    3.5 on-site hours reported

  2. Mine ventilation plan; submission and approval.

    violationRecord 9273033
    AUS #1 · 1519847

    30 CFR 75.370(a)(1)

  3. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F007238
    AUS #1 · 1519847

    3.0 on-site hours reported

  4. Spot Inspection

    inspectionRecord F007753
    AUS #1 · 1519847

    1.0 on-site hours reported

  5. Spot Inspection

    inspectionRecord F008EB9
    Mine #2 · 1519269

    2.0 on-site hours reported

  6. Mine ventilation plan; submission and approval.

    violationRecord 8309333
    AUS #1 · 1519847

    30 CFR 75.370(a)(1)

  7. Mine ventilation plan; submission and approval.

    violationRecord 8309332
    AUS #1 · 1519847

    30 CFR 75.370(a)(1) · $168.00 proposed penalty

  8. Quarterly sampling; mechanized mining units.

    violationRecord 9215516
    AUS #1 · 1519847

    30 CFR 70.208(a)(2) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F00774B
    AUS #1 · 1519847

    19.5 on-site hours reported

  10. Spot Inspection

    inspectionRecord F005003
    AUS #1 · 1519847

    1.3 on-site hours reported

  11. Other safeguards.

    violationRecord 9270811
    AUS #1 · 1519847

    30 CFR 75.1403 · Significant and substantial (S&S) · $151.00 proposed penalty

  12. Other safeguards.

    violationRecord 9270810
    AUS #1 · 1519847

    30 CFR 75.1403 · $151.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 8252416
    AUS #1 · 1519847

    30 CFR 75.400 · $151.00 proposed penalty

  14. Maintenance of incombustible content of rock dust.

    violationRecord 9270809
    AUS #1 · 1519847

    30 CFR 75.403 · $549.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 9270807
    AUS #1 · 1519847

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  16. Roof control plan.

    violationRecord 9270806
    AUS #1 · 1519847

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  17. Preshift examination at fixed intervals.

    violationRecord 9270805
    AUS #1 · 1519847

    30 CFR 75.360(a)(1) · Significant and substantial (S&S) · $10,005.00 proposed penalty

  18. Boreholes in advance of mining.

    violationRecord 9270804
    AUS #1 · 1519847

    30 CFR 75.388(g) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 9270803
    AUS #1 · 1519847

    30 CFR 77.400(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  20. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9270802
    AUS #1 · 1519847

    30 CFR 77.701 · $151.00 proposed penalty

  21. Cable fittings; suitability.

    violationRecord 9270801
    AUS #1 · 1519847

    30 CFR 77.505 · $151.00 proposed penalty

  22. Roof control plan.

    violationRecord 9272911
    AUS #1 · 1519847

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  23. Roof control plan.

    violationRecord 9272910
    AUS #1 · 1519847

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 9270800
    AUS #1 · 1519847

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  25. Electric equipment; examination, testing, and maintenance.

    violationRecord 9270799
    AUS #1 · 1519847

    30 CFR 77.502 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.