Javelin Global Commodities (UK) Ltd safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Loading and haulage equipment; inspection and maintenance.
CAVE BRANCH PLANT · 151605430 CFR 77.1606(c) · $151.00 proposed penalty
Ventilation controls.
Cloverlick Kellioka Mine · 151997330 CFR 75.333(h) · $151.00 proposed penalty
Spot Inspections
PANTHER MINE · 1518198103(i) · 5.0 on-site hours reported
Permissible electric face equipment; maintenance.
Cloverlick Kellioka Mine · 151997330 CFR 75.503 · $151.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
Cloverlick Kellioka Mine · 151997330 CFR 75.1911(b) · $151.00 proposed penalty
Automatic emergency-parking brakes.
Cloverlick Kellioka Mine · 151997330 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Methane monitors.
Cloverlick Kellioka Mine · 151997330 CFR 75.342(a)(4) · $151.00 proposed penalty
Other safeguards.
Cloverlick Kellioka Mine · 151997330 CFR 75.1403
Electric wiring and equipment; installation and maintenance.
Cloverlick Kellioka Mine · 151997330 CFR 77.516 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
PANTHER MINE · 151819830 CFR 75.1731(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
PANTHER MINE · 151819830 CFR 75.370(a)(1) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
PANTHER MINE · 151819830 CFR 75.1731(a) · $151.00 proposed penalty
Mechanical equipment guards.
Cloverlick Kellioka Mine · 151997330 CFR 75.1722(a) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
CAVE BRANCH PLANT · 151605430 CFR 77.1606(c) · $226.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
CAVE BRANCH PLANT · 151605430 CFR 77.1606(c) · $226.00 proposed penalty
Spot Inspections
PANTHER MINE · 1518198103(i) · 5.5 on-site hours reported
Mine ventilation plan; submission and approval.
PANTHER MINE · 151819830 CFR 75.370(a)(1) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
PANTHER MINE · 151819830 CFR 75.380(d)(7)(v) · $151.00 proposed penalty
Roof control plan.
PANTHER MINE · 151819830 CFR 75.220(a)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
PANTHER MINE · 1518198252.5 on-site hours reported
Examination and maintenance of firefighting equipment.
CAVE BRANCH PLANT · 151605430 CFR 77.1110 · $151.00 proposed penalty
Regular Safety and Health Inspection
CAVE BRANCH PLANT · 1516054111.3 on-site hours reported
Regular Safety and Health Inspection
Cloverlick Kellioka Mine · 1519973116.8 on-site hours reported
Spot Inspection
PANTHER MINE · 15181984.0 on-site hours reported
Spot Inspection
PANTHER MINE · 151819810.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.