James C Justice III safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing and maintenance.
BELCHER BRANCH · 460947430 CFR 75.512 · $2,503.00 proposed penalty
Cable fittings; suitability.
BELCHER BRANCH · 460947430 CFR 75.515 · $366.00 proposed penalty
Power wires and cables; insulation and protection.
BELCHER BRANCH · 460947430 CFR 75.517 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902
Maintenance of incombustible content of rock dust.
BELCHER BRANCH · 460947430 CFR 75.403 · $883.00 proposed penalty
Verbal Hazard Complaint Inspections
BELCHER BRANCH · 46094747.5 on-site hours reported
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $10,842.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Electric equipment; examination, testing and maintenance.
BELCHER BRANCH · 460947430 CFR 75.512 · $5,574.00 proposed penalty
Disconnecting devices.
BELCHER BRANCH · 460947430 CFR 75.903 · Significant and substantial (S&S) · $4,383.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Permanent splicing of trailing cables.
BELCHER BRANCH · 460947430 CFR 75.604(b) · $1,550.00 proposed penalty
Handling of materials
BELCHER BRANCH · 4609474Days away from work only
Accident narrative
Employee was shoveling dust out onto the #5 conveyor belt. At that time the employee stated that they felt their left bicep pull.
Identification of circuit breakers.
BELCHER BRANCH · 460947430 CFR 77.904 · $267.00 proposed penalty
Identification of circuit breakers.
BELCHER BRANCH · 460947430 CFR 77.904 · $267.00 proposed penalty
Mechanical equipment guards.
BELCHER BRANCH · 460947430 CFR 77.400(d) · $398.00 proposed penalty
Accumulations of combustible materials.
BELCHER BRANCH · 460947430 CFR 77.1104 · $592.00 proposed penalty
Travelways at surface installations.
BELCHER BRANCH · 460947430 CFR 77.205(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Spot Inspections
BELCHER BRANCH · 4609474103(i) · 8.3 on-site hours reported
Quantity and location of firefighting equipment.
BELCHER BRANCH · 460947430 CFR 75.1100-2(a)(1) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Travelways at surface installations.
BELCHER BRANCH · 460947430 CFR 77.205(b) · $267.00 proposed penalty
Accumulation of combustible materials.
BELCHER BRANCH · 460947430 CFR 75.400 · $959.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.