Safety activity
Map of electrical system.
BELCHER BRANCH · 460947430 CFR 75.508 · $6,041.00 proposed penalty
Preshift examination at fixed intervals.
BELCHER BRANCH · 460947430 CFR 75.360(b)(9) · $6,041.00 proposed penalty
Power wires; support.
BELCHER BRANCH · 460947430 CFR 75.516 · $549.00 proposed penalty
Frequency of examinations.
BELCHER BRANCH · 460947430 CFR 75.512-2 · $6,708.00 proposed penalty
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1) · Significant and substantial (S&S) · $28,316.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Tams No.1 Surface Mine · 46087163.3 on-site hours reported
Frequency of examinations.
BELCHER BRANCH · 460947430 CFR 75.512-2 · Significant and substantial (S&S) · $33,227.00 proposed penalty
Mechanical equipment guards.
BELCHER BRANCH · 460947430 CFR 75.1722(c) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Permanent splicing of trailing cables.
BELCHER BRANCH · 460947430 CFR 75.604(b) · Significant and substantial (S&S) · $15,768.00 proposed penalty
Verbal Hazard Complaint Inspections
BELCHER BRANCH · 460947423.0 on-site hours reported
Mine ventilation plan; submission and approval.
BELCHER BRANCH · 460947430 CFR 75.370(a)(1) · Significant and substantial (S&S) · $90,649.00 proposed penalty
Proximity detection systems.
BELCHER BRANCH · 460947430 CFR 75.1732(b)(2) · Significant and substantial (S&S) · $33,227.00 proposed penalty
Self-rescue devices; use and location requirements.
BELCHER BRANCH · 460947430 CFR 75.1714-2(b) · Significant and substantial (S&S) · $35,995.00 proposed penalty
Preshift examination at fixed intervals.
BELCHER BRANCH · 460947430 CFR 75.360(a)(1) · Significant and substantial (S&S) · $42,241.00 proposed penalty
Accumulation of combustible materials.
BELCHER BRANCH · 460947430 CFR 75.400 · $959.00 proposed penalty
Machinery and equipment; operation and maintenance.
BELCHER BRANCH · 460947430 CFR 75.1725(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Permissible electric face equipment; maintenance.
BELCHER BRANCH · 460947430 CFR 75.503 · $549.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $9,757.00 proposed penalty
Identification of circuit breakers.
BELCHER BRANCH · 460947430 CFR 75.904 · Significant and substantial (S&S) · $13,436.00 proposed penalty
Low- and medium-voltage ground check monitor circuits.
BELCHER BRANCH · 460947430 CFR 75.902 · Significant and substantial (S&S) · $9,004.00 proposed penalty
Violation — cited standard not reported
BELCHER BRANCH · 4609474$1,467.00 proposed penalty
Protection from falls of roof, face and ribs.
BELCHER BRANCH · 460947430 CFR 75.202(a) · Significant and substantial (S&S) · $21,713.00 proposed penalty
Roof control plan.
BELCHER BRANCH · 460947430 CFR 75.220(a)(1) · Significant and substantial (S&S) · $13,436.00 proposed penalty
Roof control plan.
BELCHER BRANCH · 460947430 CFR 75.220(a)(1) · $2,712.00 proposed penalty
Ventilation controls.
BELCHER BRANCH · 460947430 CFR 75.333(c)(3) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.