ACTIVE / CONTROLLER PORTFOLIO

Imerys S A; Norsk Mineral AS

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0099849

MINE PORTFOLIO

6 of 6 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Chalk Mountain Mine3102374 · Active1/8 quarters reportedMitchell, NCSurface · MSHA: Quartz, Ground01,7310010.8
Duncan Tailings Facility3102358 · Active6/8 quarters reportedMitchell, NCSurface · MSHA: Feldspar08281036.0
K-T Feldspar Plant3101334 · Active6/8 quarters reportedMitchell, NCFacility · MSHA: Feldspar0207,502541163.8
KT Mica3101955 · Active6/8 quarters reportedMitchell, NCFacility · MSHA: Mica014,1960046.3
Pine Mountain Mine3102373 · Active1/8 quarters reportedMitchell, NCSurface · MSHA: Quartz, Ground07,15018050.5
Wiseman Sullins/Chalk3100117 · Active6/8 quarters reportedMitchell, NCSurface · MSHA: Feldspar018,1284098.3

LOCATION

Portfolio map

6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

77

13 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q20
  3. 2025 Q35
  4. 2025 Q42
  5. 2026 Q11
  6. 2026 Q218
  7. 2026 Q347
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

15,835.00

76 of 77 violations with amounts

  1. 2025 Q1604
  2. 2025 Q2—
  3. 2025 Q31,036
  4. 2025 Q4302
  5. 2026 Q1—
  6. 2026 Q23,790
  7. 2026 Q310,103
  8. 2026 Q4 *—

On-site inspection hours

405.50

36 inspections · 36 with hours

  1. 2025 Q186.50
  2. 2025 Q251.25
  3. 2025 Q39.00
  4. 2025 Q460.75
  5. 2026 Q135.50
  6. 2026 Q292.75
  7. 2026 Q369.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q140604.0000586.5
2025-Q200—00451.3
2025-Q3511,036.000049.0
2025-Q420302.0000660.8
2026-Q110—00635.5
2026-Q21833,790.0010792.8
2026-Q347910,103.0000469.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF00A20F
    K-T Feldspar Plant · 3101334

    Regular Safety and Health Inspection · 55.8 on-site hours

  2. inspectionF00A20E
    Wiseman Sullins/Chalk · 3100117

    Regular Safety and Health Inspection · 21.0 on-site hours

  3. accident220261740009
    K-T Feldspar Plant · 3101334

    MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    While picking up at the end of a shift (06/10/2026) the employee felt a scratching in EE's left eye. EE didn't think much of it and went home without reporting it to management. On the morning of 06/11/2026 at 07:00 am it was reported that EE had a foreign object in EE's left eye. TQC safety took EE straight way to App. Eye Center for treatment.

  4. inspectionF03070A
    Chalk Mountain Mine · 3102374

    Regular Safety and Health Inspection · 10.0 on-site hours

  5. inspectionF030709
    KT Mica · 3101955

    Regular Safety and Health Inspection · 9.3 on-site hours

  6. violation4223060
    Pine Mountain Mine · 3102373

    56.18012 · $151.00 proposed

  7. violation4223059
    Pine Mountain Mine · 3102373

    56.4201(a)(2) · $151.00 proposed

  8. violation4223058
    Pine Mountain Mine · 3102373

    56.18002(a)(1) · $151.00 proposed

  9. violation4223057
    Pine Mountain Mine · 3102373

    56.14100(c) · $151.00 proposed

  10. violation4223056
    Pine Mountain Mine · 3102373

    56.14100(c) · $151.00 proposed

  11. violation4223055
    Pine Mountain Mine · 3102373

    56.14100(c) · $151.00 proposed

  12. violation4223054
    Pine Mountain Mine · 3102373

    56.14100(c) · $151.00 proposed

  13. violation4223053
    Pine Mountain Mine · 3102373

    56.4200(a)(1) · $151.00 proposed

  14. violation4223052
    Pine Mountain Mine · 3102373

    56.4200(a)(1) · $151.00 proposed

  15. violation4223051
    Pine Mountain Mine · 3102373

    56.14207 · S&S · $465.00 proposed

  16. violation4223050
    Pine Mountain Mine · 3102373

    56.9300(a) · $151.00 proposed

  17. violation4223049
    Pine Mountain Mine · 3102373

    56.15020 · $151.00 proposed

  18. violation3794100
    Pine Mountain Mine · 3102373

    56.4201(a)(2) · $151.00 proposed

  19. violation3794099
    Pine Mountain Mine · 3102373

    56.14207 · $151.00 proposed

  20. violation3794098
    Pine Mountain Mine · 3102373

    56.14100(a) · $151.00 proposed

  21. violation3794097
    Pine Mountain Mine · 3102373

    56.4201(a)(2) · $151.00 proposed

  22. violation3794096
    Pine Mountain Mine · 3102373

    56.11001 · S&S · $151.00 proposed

  23. inspectionF00A20B
    Pine Mountain Mine · 3102373

    Verbal Hazard Complaint Inspections · 0.0 on-site hours

  24. inspectionF00A20A
    Pine Mountain Mine · 3102373

    Regular Safety and Health Inspection · 42.3 on-site hours

  25. violation3794095
    Pine Mountain Mine · 3102373

    46.11(a) · S&S · $909.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.