Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Calcium Products Plant1300049 · Active6/8 quarters reported | Pocahontas, IAFacility · MSHA: Crushed, Broken Limestone NEC | 0 | 187,058 | 37 | 3 | 99.3 |
| MLC - Bonne Terre2302371 · Active6/8 quarters reported | St Francois, MOFacility · MSHA: Lime | 0 | 124,215 | 67 | 3 | 406.0 |
| MLC - Calera0103227 · Active6/8 quarters reported | Shelby, ALFacility · MSHA: Lime | 0 | 167,527 | 13 | 2 | 85.5 |
| MLC - Mobile0103476 · Active6/8 quarters reported | Mobile, ALFacility · MSHA: Crushed, Broken Limestone NEC | 0 | 8,537 | 3 | 0 | 31.0 |
| MLC - Ste. Genevieve2300542 · Active6/8 quarters reported | Ste Genevieve, MOUnderground · MSHA: Lime | 0 | 1,941,006 | 254 | 27 | 1,284.8 |
| MLC - Verona1519182 · Active6/8 quarters reported | Gallatin, KYFacility · MSHA: Lime | 0 | 124,368 | 13 | 2 | 100.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 6 mines listed under this controller were checked; 6 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 417,646 | 0.00 | 782 | 6/6 mines reporting |
| 2025 Q2 | 0 | 419,120 | 0.00 | 792 | 6/6 mines reporting |
| 2025 Q3 | 0 | 442,685 | 0.00 | 818 | 6/6 mines reporting |
| 2025 Q4 | 0 | 426,237 | 0.00 | 804 | 6/6 mines reporting |
| 2026 Q1 | 0 | 422,666 | 0.00 | 822 | 6/6 mines reporting |
| 2026 Q2 | 0 | 424,357 | 0.00 | 848 | 6/6 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
72 significant & substantial (S&S)
1 records classified as fatality
315 of 387 violations with amounts
63 inspections · 63 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 42 | 14 | 121,998.00 | 7 | 0 | 5 | 203.8 |
| 2025-Q2 | 46 | 12 | 56,805.00 | 9 | 0 | 7 | 249.8 |
| 2025-Q3 | 27 | 5 | 33,014.00 | 6 | 0 | 11 | 197.0 |
| 2025-Q4 | 65 | 3 | 54,248.00 | 3 | 1 | 11 | 518.8 |
| 2026-Q1 | 41 | 14 | 114,971.00 | 5 | 0 | 7 | 187.0 |
| 2026-Q2 | 43 | 6 | 51,760.00 | 4 | 0 | 6 | 267.5 |
| 2026-Q3 | 69 | 10 | 25,473.00 | 3 | 0 | 11 | 289.8 |
| 2026-Q4 * | 54 | 8 | — | 0 | 0 | 5 | 93.5 |
All violations issued in the selected period. Counts combine subsections.
57.20003(a) · $755.00 proposed
57.20003(a) · $755.00 proposed
57.12004 · $1,320.00 proposed
57.14101(a)(2) · $193.00 proposed
57.14101(a)(2) · $642.00 proposed
57.20003(a) · $755.00 proposed
56.14132(b)(1)(i) · $151.00 proposed
57.14112(b) · $592.00 proposed
57.4104(a) · $193.00 proposed
57.12017 · S&S · $3,184.00 proposed
57.14100(b) · $398.00 proposed
57.12004 · $1,320.00 proposed
50.20(a) · $151.00 proposed
Regular Safety and Health Inspection · 6.0 on-site hours
57.20003(a) · $755.00 proposed
57.20003(a) · $755.00 proposed
57.14107(a) · $592.00 proposed
57.18002(a) · $193.00 proposed
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
Employee stepped into a pile of wet lime, resulting in burns to the leg and ankle.
Regular Safety and Health Inspection · 177.5 on-site hours
Impoundment Spot Inspection · 3.0 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
Employee was removing a motor and reducer. Had motor rigged up with motor puller and chain and was helping lower the motor to the ground when the shaft slid out of the broken section of the auger jerking the employee forward. Declined initial treatment. Went to the clinic on April 10, 2026 due to shoulder pain and was diagnosed with a right shoulder strain and deltoid tendinitis.
MACHINERY · DAYS RESTRICTED ACTIVITY ONLY
While enlarging a hole for an E-Stop using a step bit, the bit snagged an aluminum label plate. The plate spun unexpectedly, resulting in cuts to the operator's thumb and index finger.
OTHER · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was leaving shack to move the track mobile off the tracks. The wind picked up and blew a large amount of lime in their face, getting into their eyes
56.17001 · S&S · $14,557.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.