GCC SAB de CV safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Toro Aggregates · 29022956.3 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
King II · 050486430 CFR 75.1731(a) · $151.00 proposed penalty
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $177.00 proposed penalty
Splices and repairs of power cables.
Toro Aggregates · 290229530 CFR 56.12013(c) · $151.00 proposed penalty
Moving machine parts.
Toro Aggregates · 290229530 CFR 56.14107(a) · $151.00 proposed penalty
Moving machine parts.
Toro Aggregates · 290229530 CFR 56.14107(a) · $151.00 proposed penalty
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $177.00 proposed penalty
Permanent splicing of trailing cables.
King II · 050486430 CFR 75.604(b) · $151.00 proposed penalty
Ventilation controls.
King II · 050486430 CFR 75.333(h) · $177.00 proposed penalty
Testing grounding systems.
Vado Quarry · 290212830 CFR 56.12028 · $1,126.00 proposed penalty
Moving machine parts.
Vado Quarry · 290212830 CFR 56.14107(a) · $504.00 proposed penalty
Parking procedures for unattended equipment.
Vado Quarry · 290212830 CFR 56.14207 · $1,126.00 proposed penalty
Regular Safety and Health Inspection
Vado Quarry · 29021288.0 on-site hours reported
Compliance Follow-up Inspection
EAST LOOP 375 SAND PLT · 41038160.5 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Odessa Cement Plant · 410006030 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Odessa Cement Plant · 410006030 CFR 50.30(a) · $151.00 proposed penalty
Training plan implementation.
Odessa Cement Plant · 410006030 CFR 46.4(a)(1) · $151.00 proposed penalty
Requirements for written safety program.
Odessa Cement Plant · 410006030 CFR 56.23003(c) · $151.00 proposed penalty
Moving machine parts.
Hondo Plant · 410485330 CFR 56.14107(a) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Hondo Plant · 41048530.8 on-site hours reported
Regular Safety and Health Inspection
Hondo Plant · 41048534.8 on-site hours reported
Inspection and cover plates.
Odessa Cement Plant · 410006030 CFR 56.12032 · $151.00 proposed penalty
Machinery, equipment, and tools.
Odessa Cement Plant · 410006030 CFR 56.14205 · Significant and substantial (S&S) · $642.00 proposed penalty
Safety defects; examination, correction and records.
Odessa Cement Plant · 410006030 CFR 56.14100(c) · Significant and substantial (S&S) · $642.00 proposed penalty
Air receiver tanks.
Odessa Cement Plant · 410006030 CFR 56.13011 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.