Freeport-McMoRan Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Correction of hazardous conditions.
HENDERSON OPERATIONS · 050079030 CFR 57.3200 · $151.00 proposed penalty
Housekeeping.
HENDERSON OPERATIONS · 050079030 CFR 57.20003(a) · $1,037.00 proposed penalty
Restricted clearance.
HENDERSON OPERATIONS · 050079030 CFR 57.11008 · $193.00 proposed penalty
Construction and maintenance of guards.
Climax Mine · 050225630 CFR 56.14112(b) · $151.00 proposed penalty
General requirements for boilers and pressure vessels.
Climax Mine · 050225630 CFR 56.13001 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Climax Mine · 050225630 CFR 56.12008 · $151.00 proposed penalty
Housekeeping.
Climax Mine · 050225630 CFR 56.20003(a) · $177.00 proposed penalty
Machinery, equipment, and tools.
Climax Mine · 050225630 CFR 56.14205 · $592.00 proposed penalty
Storage of hazardous materials.
Climax Mine · 050225630 CFR 56.16003 · $151.00 proposed penalty
Inspection.
Climax Mine · 050225630 CFR 56.4201(a) · $288.00 proposed penalty
Housekeeping.
Climax Mine · 050225630 CFR 56.20003(a) · $193.00 proposed penalty
Combustible waste.
Climax Mine · 050225630 CFR 56.4104 · $288.00 proposed penalty
Berms or guardrails.
Chino Mines Co Mine · 290070830 CFR 56.9300(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Identification of power switches.
Chino Mines Co Mine · 290070830 CFR 56.12018 · $313.00 proposed penalty
Identification of power switches.
Chino Mines Co Mine · 290070830 CFR 56.12018 · $313.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
Chino Mines Co Mine · 290070830 CFR 50.20(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $883.00 proposed penalty
Safety defects; examination, correction and records.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.14100(c) · $2,936.00 proposed penalty
Housekeeping.
Freeport-McMoRan Morenci Inc. · 020002430 CFR 56.20003(a) · $3,184.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.