Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Fire suppression systems for diesel-powered equipment and fuel transportation units.
MC#1 Mine · 110318930 CFR 75.1911(i) · $209.00 proposed penalty
Handling of materials
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was helping to put a pulling coupler on a section of 8" pipe. when EE stood up EE felt pain in EE's lower back.
Other
Deer Run Mine · 1103182Days away from work only
Accident narrative
IE stepped from one side of the bolter to the other and the left knee popped while checking the torque on the roof bolts.
Spot Inspections
Deer Run Mine · 1103182103(i) · 4.0 on-site hours reported
Permanent splicing of trailing cables.
Mach #1 Mine · 110314130 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Power wires and cables; insulation and protection.
Mach #1 Mine · 110314130 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Other safeguards.
Mach #1 Mine · 110314130 CFR 75.1403 · Significant and substantial (S&S) · $592.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mach #1 Mine · 110314130 CFR 75.512 · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Spot Inspections
Mach #1 Mine · 1103141103(i) · 8.5 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.5 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
Mach #1 Mine · 110314130 CFR 75.1909(a)(2) · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Violation — cited standard not reported
Mach #1 Mine · 1103141$561.00 proposed penalty
Mine ventilation plan; submission and approval.
Mach #1 Mine · 110314130 CFR 75.370(a)(1) · $642.00 proposed penalty
Machinery and equipment; operation and maintenance.
MC#1 Mine · 110318930 CFR 75.1725(a) · $193.00 proposed penalty
Methane monitors.
MC#1 Mine · 110318930 CFR 75.342(a)(4) · $193.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
MC#1 Mine · 110318930 CFR 75.1909(a)(2) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $151.00 proposed penalty
Machinery
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was hooking up a tube strap when EE's finger became hung in the hook and when the strap was released EE's finger was pulled in a non-functioning direction.
Powered haulage
MC#1 Mine · 1103189Days away from work only
Accident narrative
I.E. stated they were riding in a mantrip as a passenger, the driver hit a hole in the travel way causing the E.E. to hit their head on the canopy. I.E. has worked until 3/23/2026 until doctor took employee off work.
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.