← Foresight Energy Labor LLC

Foresight Energy Labor LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Slip or fall of person

    accidentRecord 220261560008
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. was hanging cable when EE lost EE's balance and hit EE's back.

  2. Accumulation of combustible materials.

    violationRecord 5015496
    Deer Run Mine · 1103182

    30 CFR 75.400 · $336.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F016B02
    Mach #1 Mine · 1103141

    103(i) · 6.5 on-site hours reported

  4. Maintenance of incombustible content of rock dust.

    violationRecord 9789711
    MC#1 Mine · 1103189

    30 CFR 75.403 · $193.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5016176
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F016B01
    Mach #1 Mine · 1103141

    103(i) · 6.5 on-site hours reported

  7. Spot Inspections

    inspectionRecord F00B6CA
    Deer Run Mine · 1103182

    103(i) · 5.0 on-site hours reported

  8. Spot Inspections

    inspectionRecord F00C527
    MC#1 Mine · 1103189

    103(i) · 5.8 on-site hours reported

  9. On-shift examination.

    violationRecord 5011237
    Mach #1 Mine · 1103141

    30 CFR 75.362(d)(3)(ii) · $151.00 proposed penalty

  10. Warning devices.

    violationRecord 5015495
    Deer Run Mine · 1103182

    30 CFR 75.208 · $193.00 proposed penalty

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 9789710
    MC#1 Mine · 1103189

    30 CFR 75.512 · $151.00 proposed penalty

  12. Non-Injury Accident Investigation

    inspectionRecord F016B00
    Mach #1 Mine · 1103141

    22.0 on-site hours reported

  13. Spot Inspections

    inspectionRecord F01F3C8
    MC#1 Mine · 1103189

    103(i) · 6.3 on-site hours reported

  14. Violation — cited standard not reported

    violationRecord 5011236
    Mach #1 Mine · 1103141
  15. Protection from falls of roof, face and ribs.

    violationRecord 5016175
    Mach #1 Mine · 1103141

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5016174
    Mach #1 Mine · 1103141

    30 CFR 75.333(h) · $151.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 9789992
    MC#1 Mine · 1103189

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  18. Permanent splicing of trailing cables.

    violationRecord 9789991
    MC#1 Mine · 1103189

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  19. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 9789990
    MC#1 Mine · 1103189

    30 CFR 75.1911(i) · $193.00 proposed penalty

  20. Reporting SCSR inventory and malfunctions; retention of SCSRs.

    violationRecord 9788613
    MC#1 Mine · 1103189

    30 CFR 75.1714-8(a)(2) · $151.00 proposed penalty

  21. Fall of roof or back

    accidentRecord 220261480006
    Mach #1 Mine · 1103141

    Accident only

    Accident narrative

    A roof fall occurred underground at xc 23 number 5 entry on the e. mains.

  22. Handling of materials

    accidentRecord 220261560013
    Mach #1 Mine · 1103141

    No dys awy frm wrk,no rstr act

    Accident narrative

    The injured employee was working on a belt splice when EE's right arm contacted the belt shear blade resulting in a laceration. The belt shear was not in operation at the time of injury. The injury resulted in sutures.

  23. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F00224D
    Mach #1 Mine · 1103141

    6.5 on-site hours reported

  24. Reporting SCSR inventory and malfunctions; retention of SCSRs.

    violationRecord 9788612
    Mach #1 Mine · 1103141

    30 CFR 75.1714-8(a)(2) · $151.00 proposed penalty

  25. Availability of approved self-rescue devices; instruction in use and location.

    violationRecord 9788611
    Mach #1 Mine · 1103141

    30 CFR 75.1714(a) · Significant and substantial (S&S) · $7,676.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.