← Foresight Energy Labor LLC

Foresight Energy Labor LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F0352AC
    Deer Run Mine · 1103182

    103(i) · 6.3 on-site hours reported

  2. Conventional roof support.

    violationRecord 5016434
    Mach #1 Mine · 1103141

    30 CFR 75.206(e) · $193.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5011162
    Mach #1 Mine · 1103141

    30 CFR 75.400 · $366.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5011161
    Mach #1 Mine · 1103141

    30 CFR 75.400 · $366.00 proposed penalty

  5. Electrical connections or splices; suitability.

    violationRecord 9789736
    Mach #1 Mine · 1103141

    30 CFR 75.514 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  6. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5011267
    MC#1 Mine · 1103189

    30 CFR 75.363(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5011266
    MC#1 Mine · 1103189

    30 CFR 75.333(b)(4) · Significant and substantial (S&S) · $4,497.00 proposed penalty

  8. Handtools (nonpowered)

    accidentRecord 220262220020
    Mach #1 Mine · 1103141

    Days away from work only

    Accident narrative

    I.E. was raking out coal from under the belt when they turned their head and was hit above left eye with a shovel being used by a co-worker.

  9. Spot Inspections

    inspectionRecord F00C535
    Mach #1 Mine · 1103141

    103(i) · 6.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F00C1BE
    MC#1 Mine · 1103189

    103(i) · 6.0 on-site hours reported

  11. Methane monitors.

    violationRecord 9789735
    Mach #1 Mine · 1103141

    30 CFR 75.342(c)(1) · Significant and substantial (S&S) · $465.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5016433
    MC#1 Mine · 1103189

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 5016912
    MC#1 Mine · 1103189

    30 CFR 75.604(b) · $818.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5016911
    MC#1 Mine · 1103189

    30 CFR 75.400 · $398.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5011265
    MC#1 Mine · 1103189

    30 CFR 75.1731(b) · $267.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5011264
    MC#1 Mine · 1103189

    30 CFR 75.1731(a) · $336.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5011263
    MC#1 Mine · 1103189

    30 CFR 75.400 · $398.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 5011262
    MC#1 Mine · 1103189

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9789734
    Mach #1 Mine · 1103141

    30 CFR 75.400 · $366.00 proposed penalty

  20. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9789733
    Mach #1 Mine · 1103141

    30 CFR 75.1107-9(a)(2) · $193.00 proposed penalty

  21. Permissible electric face equipment; maintenance.

    violationRecord 5016432
    MC#1 Mine · 1103189

    30 CFR 75.503 · $313.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5011261
    MC#1 Mine · 1103189

    30 CFR 75.400 · $398.00 proposed penalty

  23. Underground diesel fuel storage facilities and areas; construction and safety precautions.

    violationRecord 5011260
    MC#1 Mine · 1103189

    30 CFR 75.1903(b)(4) · $151.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 9789732
    Mach #1 Mine · 1103141

    30 CFR 75.512 · $226.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5016431
    MC#1 Mine · 1103189

    30 CFR 75.400 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.