Foresight Energy Labor LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
Deer Run Mine · 1103182103(i) · 6.3 on-site hours reported
Conventional roof support.
Mach #1 Mine · 110314130 CFR 75.206(e) · $193.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Electrical connections or splices; suitability.
Mach #1 Mine · 110314130 CFR 75.514 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
MC#1 Mine · 110318930 CFR 75.363(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Ventilation controls.
MC#1 Mine · 110318930 CFR 75.333(b)(4) · Significant and substantial (S&S) · $4,497.00 proposed penalty
Handtools (nonpowered)
Mach #1 Mine · 1103141Days away from work only
Accident narrative
I.E. was raking out coal from under the belt when they turned their head and was hit above left eye with a shovel being used by a co-worker.
Spot Inspections
Mach #1 Mine · 1103141103(i) · 6.0 on-site hours reported
Spot Inspections
MC#1 Mine · 1103189103(i) · 6.0 on-site hours reported
Methane monitors.
Mach #1 Mine · 110314130 CFR 75.342(c)(1) · Significant and substantial (S&S) · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
MC#1 Mine · 110318930 CFR 75.370(a)(1) · $336.00 proposed penalty
Permanent splicing of trailing cables.
MC#1 Mine · 110318930 CFR 75.604(b) · $818.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $398.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(b) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MC#1 Mine · 110318930 CFR 75.1731(a) · $336.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $398.00 proposed penalty
Escapeways; bituminous and lignite mines.
MC#1 Mine · 110318930 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Accumulation of combustible materials.
Mach #1 Mine · 110314130 CFR 75.400 · $366.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Mach #1 Mine · 110314130 CFR 75.1107-9(a)(2) · $193.00 proposed penalty
Permissible electric face equipment; maintenance.
MC#1 Mine · 110318930 CFR 75.503 · $313.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $398.00 proposed penalty
Underground diesel fuel storage facilities and areas; construction and safety precautions.
MC#1 Mine · 110318930 CFR 75.1903(b)(4) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Mach #1 Mine · 110314130 CFR 75.512 · $226.00 proposed penalty
Accumulation of combustible materials.
MC#1 Mine · 110318930 CFR 75.400 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.