ACTIVE / CONTROLLER PORTFOLIO

First Majestic Silver Corporation

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0161961

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Jerritt Canyon Mill2601621 · Active6/8 quarters reportedElko, NVFacility · MSHA: Gold Ore0175,06519061.0
Lee Smith2602397 · Active6/8 quarters reportedElko, NVUnderground · MSHA: Gold Ore003021.8
SSX Mine2602299 · Active6/8 quarters reportedElko, NVUnderground · MSHA: Gold Ore0015075.0

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

37

1 significant & substantial (S&S)

  1. 2025 Q13
  2. 2025 Q23
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q19
  6. 2026 Q28
  7. 2026 Q314
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

7,346.00

36 of 37 violations with amounts

  1. 2025 Q1453
  2. 2025 Q2453
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q11,359
  6. 2026 Q21,465
  7. 2026 Q33,616
  8. 2026 Q4 *—

On-site inspection hours

157.75

22 inspections · 22 with hours

  1. 2025 Q112.00
  2. 2025 Q29.75
  3. 2025 Q33.25
  4. 2025 Q41.75
  5. 2026 Q119.00
  6. 2026 Q235.75
  7. 2026 Q376.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q130453.0000412.0
2025-Q230453.000019.8
2025-Q300—0013.3
2025-Q400—0011.8
2026-Q1901,359.0000219.0
2026-Q2801,465.0000735.8
2026-Q31413,616.0000676.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF011FD5
    Lee Smith · 2602397

    Verbal Hazard Complaint Inspections · 8.0 on-site hours

  2. violation5109283
    Jerritt Canyon Mill · 2601621

    56.15001 · $151.00 proposed

  3. violation5109282
    Jerritt Canyon Mill · 2601621

    56.4201(a)(2) · $151.00 proposed

  4. inspectionF01D76E
    Jerritt Canyon Mill · 2601621

    Impoundment Spot Inspection · 3.0 on-site hours

  5. inspectionF02B71B
    Jerritt Canyon Mill · 2601621

    Regular Safety and Health Inspection · 13.3 on-site hours

  6. violation5109281
    Jerritt Canyon Mill · 2601621

    56.12032 · $1,431.00 proposed

  7. violation5109280
    Jerritt Canyon Mill · 2601621

    56.14112(a)(1) · $151.00 proposed

  8. violation5109589
    SSX Mine · 2602299

    49.6(b) · $165.00 proposed

  9. violation5109588
    Lee Smith · 2602397

    57.4201(a)(2) · $151.00 proposed

  10. inspectionF011FD2
    Lee Smith · 2602397

    Regular Safety and Health Inspection · 11.5 on-site hours

  11. violation5109586
    SSX Mine · 2602299

    57.14100(c) · $267.00 proposed

  12. violation5109587
    Lee Smith · 2602397

    57.18025 · S&S

  13. violation5109572
    Lee Smith · 2602397

    57.14100(c) · $165.00 proposed

  14. inspectionF033B5E
    SSX Mine · 2602299

    Compliance Follow-up Inspection · 3.8 on-site hours

  15. violation5109585
    SSX Mine · 2602299

    57.14100(b) · $151.00 proposed

  16. violation5109584
    SSX Mine · 2602299

    57.14100(b) · $366.00 proposed

  17. inspectionF011FD1
    SSX Mine · 2602299

    Regular Safety and Health Inspection · 36.8 on-site hours

  18. violation5109583
    SSX Mine · 2602299

    57.4102 · $151.00 proposed

  19. violation5109582
    SSX Mine · 2602299

    57.4102 · $165.00 proposed

  20. violation5109581
    SSX Mine · 2602299

    57.20003(a) · $151.00 proposed

  21. inspectionF013EC1
    Jerritt Canyon Mill · 2601621

    Impoundment Spot Inspection · 1.5 on-site hours

  22. inspectionF033B5A
    SSX Mine · 2602299

    Compliance Follow-up Inspection · 2.8 on-site hours

  23. inspectionF033B59
    SSX Mine · 2602299

    Electrical Technical Investigation · 7.0 on-site hours

  24. violation5168035
    SSX Mine · 2602299

    57.14100(b) · $151.00 proposed

  25. violation5168034
    SSX Mine · 2602299

    57.4160(a)(1) · $165.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.