MSHA CONTROLLER ID0150303

MINE PORTFOLIO

6 of 6 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Gamebird Pit2601507 · Intermittent6/8 quarters reportedNye, NVSurface · MSHA: Construction Sand and Gravel04,060303.5
Morales Gravel Pit2602686 · Active6/8 quarters reportedNye, NVSurface · MSHA: Construction Sand and Gravel09,7157025.5
Nevada Quality Rock2602326 · Intermittent6/8 quarters reportedNye, NVSurface · MSHA: Construction Sand and Gravel03,016909.3
Wulfenstein Pit2601506 · Active6/8 quarters reportedNye, NVSurface · MSHA: Construction Sand and Gravel019,22722030.3
Wulfenstein Portable2602703 · Intermittent6/8 quarters reportedNye, NVSurface · MSHA: Construction Sand and Gravel04,470004.8
Calvada Pit And Mill2601066 · AbandonedNye, NVSurface · MSHA: Construction Sand and Gravel——00—

LOCATION

Portfolio map

5 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

41

3 significant & substantial (S&S)

  1. 2025 Q17
  2. 2025 Q211
  3. 2025 Q31
  4. 2025 Q48
  5. 2026 Q19
  6. 2026 Q20
  7. 2026 Q35
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

12,334.00

36 of 41 violations with amounts

  1. 2025 Q15,331
  2. 2025 Q22,155
  3. 2025 Q3197
  4. 2025 Q41,423
  5. 2026 Q13,228
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

73.25

11 inspections · 11 with hours

  1. 2025 Q121.00
  2. 2025 Q216.50
  3. 2025 Q31.00
  4. 2025 Q45.75
  5. 2026 Q117.50
  6. 2026 Q2—
  7. 2026 Q311.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1705,331.0000221.0
2025-Q21102,155.0000116.5
2025-Q310197.000011.0
2025-Q4811,423.000025.8
2026-Q1913,228.0000317.5
2026-Q200—000—
2026-Q351—00211.5
2026-Q4 *00—000—
Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

3 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.