Edward A Asbury safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing, and maintenance.
No 1 · 460736630 CFR 77.502 · $177.00 proposed penalty
Examination and maintenance of firefighting equipment.
No 1 · 460736630 CFR 77.1110 · $151.00 proposed penalty
Emergency tethers.
No 1 · 460736630 CFR 75.1714-6 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Superior Cleaning Plant · 46033034.5 on-site hours reported
Regular Safety and Health Inspection
Superior Cleaning Plant · 460330370.8 on-site hours reported
Travelways at surface installations.
Superior Cleaning Plant · 460330330 CFR 77.205(b) · Significant and substantial (S&S) · $549.00 proposed penalty
Surface installations; general.
Superior Cleaning Plant · 460330330 CFR 77.200 · Significant and substantial (S&S) · $818.00 proposed penalty
Quantity and location of firefighting equipment.
Newhall Surface Mine No. 3 · 460962430 CFR 77.1109(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Newhall Surface Mine No. 3 · 460962430 CFR 77.1605(k) · $151.00 proposed penalty
Regular Safety and Health Inspection
No 1 · 460736625.3 on-site hours reported
Regular Safety and Health Inspection
Newhall Surface Mine No. 3 · 460962445.5 on-site hours reported
Verbal Hazard Complaint Inspections
Sewell Mine B · 46062653.0 on-site hours reported
Verbal Hazard Complaint Inspections
Sewell Mine B · 46062655.0 on-site hours reported
Regular Safety and Health Inspection
Sewell Mine B · 4606265110.8 on-site hours reported
Spot Inspection
Sewell Mine B · 460626512.8 on-site hours reported
Verbal Hazard Complaint Inspections
Sewell Mine B · 460626510.8 on-site hours reported
Violation — cited standard not reported
Sewell Mine B · 4606265$2,021.00 proposed penalty
Air quality detectors and measurement devices.
Sewell Mine B · 460626530 CFR 75.320(a) · $1,818.00 proposed penalty
Air quality detectors and measurement devices.
Sewell Mine B · 460626530 CFR 75.320(c) · $151.00 proposed penalty
Violation — cited standard not reported
Sewell Mine B · 4606265$658.00 proposed penalty
Verbal Hazard Complaint Inspections
Sewell Mine B · 460626510.0 on-site hours reported
Air quality detectors and measurement devices.
Sewell Mine B · 460626530 CFR 75.320(a) · $1,320.00 proposed penalty
Air quality detectors and measurement devices.
Sewell Mine B · 460626530 CFR 75.320(a) · $1,320.00 proposed penalty
Machinery and equipment; operation and maintenance.
Sewell Mine B · 460626530 CFR 77.404(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Loading and haulage equipment; installations.
Sewell Mine B · 460626530 CFR 77.1605(d) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.