ACTIVE / CONTROLLER PORTFOLIO

Eagle Summit Resources LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0196420

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Edwight Surface Mine4608977 · Active6/8 quarters reportedRaleigh, WVSurface · MSHA: Coal (Bituminous)191,153111,701261212.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

26

4 significant & substantial (S&S)

  1. 2025 Q13
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q418
  5. 2026 Q15
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

58,894.00

26 of 26 violations with amounts

  1. 2025 Q132,697
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q423,408
  5. 2026 Q12,789
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

212.75

11 inspections · 11 with hours

  1. 2025 Q18.75
  2. 2025 Q253.50
  3. 2025 Q34.00
  4. 2025 Q494.25
  5. 2026 Q133.75
  6. 2026 Q2—
  7. 2026 Q318.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q13132,697.000028.8
2025-Q200—00253.5
2025-Q300—0014.0
2025-Q418323,408.0010294.3
2026-Q1502,789.0000333.8
2026-Q200—000—
2026-Q300—00118.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF0150BC
    Edwight Surface Mine · 4608977

    Regular Safety and Health Inspection · 18.5 on-site hours

  2. inspection6322441
    Edwight Surface Mine · 4608977

    Spot Inspection · 13.3 on-site hours

  3. inspectionF00190B
    Edwight Surface Mine · 4608977

    Verbal Hazard Complaint Inspections · 17.5 on-site hours

  4. violation5028545
    Edwight Surface Mine · 4608977

    77.1606(c) · $226.00 proposed

  5. violation5022654
    Edwight Surface Mine · 4608977

    48.31(a)(1) · $184.00 proposed

  6. violation5022653
    Edwight Surface Mine · 4608977

    77.1606(c) · $1,679.00 proposed

  7. violation5022652
    Edwight Surface Mine · 4608977

    77.410(b) · $549.00 proposed

  8. violation5022651
    Edwight Surface Mine · 4608977

    77.1606(c) · $151.00 proposed

  9. inspectionF001905
    Edwight Surface Mine · 4608977

    Spot Inspection · 3.0 on-site hours

  10. violation5020834
    Edwight Surface Mine · 4608977

    45.4 · $151.00 proposed

  11. violation5020833
    Edwight Surface Mine · 4608977

    77.208(d) · $504.00 proposed

  12. violation5020832
    Edwight Surface Mine · 4608977

    77.208(e) · $504.00 proposed

  13. violation5020831
    Edwight Surface Mine · 4608977

    47.44(b) · $2,503.00 proposed

  14. accident220260060012
    Edwight Surface Mine · 4608977

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee stated that EE was operating a 101 Komatsu truck when the truck struck a hole in the road. This caused the employees seat to bottom out, jarring EE's back. Due to medical information received on 12/31/2025, this incident is being submitted as an Occupational Illness.

  15. violation5020830
    Edwight Surface Mine · 4608977

    77.209 · $151.00 proposed

  16. violation5020829
    Edwight Surface Mine · 4608977

    77.1606(c) · $504.00 proposed

  17. violation5020828
    Edwight Surface Mine · 4608977

    77.1606(c) · S&S · $8,315.00 proposed

  18. violation5020827
    Edwight Surface Mine · 4608977

    77.1104 · $592.00 proposed

  19. violation5020826
    Edwight Surface Mine · 4608977

    77.1606(c) · $504.00 proposed

  20. violation5020825
    Edwight Surface Mine · 4608977

    77.1606(c) · $1,679.00 proposed

  21. violation5020824
    Edwight Surface Mine · 4608977

    77.1104 · $592.00 proposed

  22. violation5020823
    Edwight Surface Mine · 4608977

    77.1606(c) · $1,679.00 proposed

  23. violation5020821
    Edwight Surface Mine · 4608977

    77.1606(c) · S&S · $2,503.00 proposed

  24. violation5020820
    Edwight Surface Mine · 4608977

    77.1104 · $193.00 proposed

  25. violation5020819
    Edwight Surface Mine · 4608977

    77.1109(e)(1) · $177.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON145.53Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS152,445Allocated from published county sales
ESTIMATED COAL REVENUE · USD22,185,316Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Edwight Surface Mine4608977 · Raleigh, West Virginia148,962145.53152,44522,185,316County allocation estimate2.11% of eligible county production12 eligible mines / 12 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.