ACTIVE / CONTROLLER PORTFOLIO

David Alexander

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0191180

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Mitchell Quarry3901608 · Active5/8 quarters reportedHanson, SDSurface · MSHA: Dimension Quartzite031,4041060158.0

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

106

27 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q23
  3. 2025 Q314
  4. 2025 Q421
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q368
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

60,137.00

82 of 106 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2453
  3. 2025 Q38,350
  4. 2025 Q49,060
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q342,274
  8. 2026 Q4 *—

On-site inspection hours

158.00

12 inspections · 12 with hours

  1. 2025 Q1—
  2. 2025 Q217.75
  3. 2025 Q324.75
  4. 2025 Q437.00
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q378.50
  8. 2026 Q4 *0.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q230453.0000117.8
2025-Q31458,350.0000224.8
2025-Q42159,060.0000437.0
2026-Q100—000—
2026-Q200—000—
2026-Q3681742,274.0000478.5
2026-Q4 *00—0010.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5270407
    Mitchell Quarry · 3901608

    56.14103(b) · $151.00 proposed

  2. violation5270406
    Mitchell Quarry · 3901608

    56.14101(a)(2) · $151.00 proposed

  3. violation5270405
    Mitchell Quarry · 3901608

    56.14207 · $151.00 proposed

  4. violation5270404
    Mitchell Quarry · 3901608

    56.14132(b)(1)(i) · $151.00 proposed

  5. violation5270402
    Mitchell Quarry · 3901608

    56.14112(a)(1) · $209.00 proposed

  6. violation5270401
    Mitchell Quarry · 3901608

    56.14112(a)(1) · $209.00 proposed

  7. violation5113800
    Mitchell Quarry · 3901608

    56.14107(a)

  8. violation5113799
    Mitchell Quarry · 3901608

    56.11004 · $209.00 proposed

  9. violation5113798
    Mitchell Quarry · 3901608

    56.14132(b)(1)(i) · $209.00 proposed

  10. violation5113797
    Mitchell Quarry · 3901608

    56.14132(a) · S&S · $3,448.00 proposed

  11. violation5113796
    Mitchell Quarry · 3901608

    47.41(a) · $151.00 proposed

  12. violation5113795
    Mitchell Quarry · 3901608

    56.14207 · $313.00 proposed

  13. violation5113794
    Mitchell Quarry · 3901608

    56.4104(a) · $209.00 proposed

  14. violation5113793
    Mitchell Quarry · 3901608

    56.12018 · $151.00 proposed

  15. violation5113792
    Mitchell Quarry · 3901608

    56.14115(b) · $209.00 proposed

  16. violation5113791
    Mitchell Quarry · 3901608

    56.12004 · $313.00 proposed

  17. violation5113790
    Mitchell Quarry · 3901608

    56.12032 · $313.00 proposed

  18. violation5113789
    Mitchell Quarry · 3901608

    56.4104(a) · $209.00 proposed

  19. violation5113788
    Mitchell Quarry · 3901608

    56.4101 · $313.00 proposed

  20. violation5113787
    Mitchell Quarry · 3901608

    47.41(a) · $209.00 proposed

  21. violation5113785
    Mitchell Quarry · 3901608

    56.11001 · S&S

  22. violation5113784
    Mitchell Quarry · 3901608

    56.11004 · $209.00 proposed

  23. inspectionF03F366
    Mitchell Quarry · 3901608

    Regular Safety and Health Inspection · 37.3 on-site hours

  24. inspectionF02E63A
    Mitchell Quarry · 3901608

    Compliance Follow-up Inspection · 1.8 on-site hours

  25. inspectionF0231DA
    Mitchell Quarry · 3901608

    Compliance Follow-up Inspection · 1.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.