Dale Armstrong safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
Bonito Pit · 29024500.0 on-site hours reported
Compliance Follow-up Inspection
Bonito Pit · 290245012.5 on-site hours reported
Safety belts and lines.
Bonito Pit · 290245030 CFR 56.15005 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Procedures during repairs or maintenance.
Bonito Pit · 290245030 CFR 56.14105 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Verbal Hazard Complaint Inspections
Bonito Pit · 290245012.3 on-site hours reported
Examination of working places.
Bonito Pit · 290245030 CFR 56.18002(b) · $209.00 proposed penalty
Examination of working places.
Bonito Pit · 290245030 CFR 56.18002(a) · $209.00 proposed penalty
Construction and maintenance of guards.
Bonito Pit · 290245030 CFR 56.14112(b) · $398.00 proposed penalty
Correction of dangerous conditions.
Bonito Pit · 290245030 CFR 56.12030 · $267.00 proposed penalty
Insulation and fittings for power wires and cables.
Bonito Pit · 290245030 CFR 56.12008 · $267.00 proposed penalty
Moving machine parts.
Bonito Pit · 290245030 CFR 56.14107(a) · $398.00 proposed penalty
Inspection and cover plates.
Bonito Pit · 290245030 CFR 56.12032 · $883.00 proposed penalty
Protection for openings around travelways.
Bonito Pit · 290245030 CFR 56.11012 · $267.00 proposed penalty
Correction of dangerous conditions.
Bonito Pit · 290245030 CFR 56.12030 · $267.00 proposed penalty
Electrical conductors.
Bonito Pit · 290245030 CFR 56.12004 · $883.00 proposed penalty
Safety defects; examination, correction and records.
Bonito Pit · 290245030 CFR 56.14100(c) · $267.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Bonito Pit · 290245030 CFR 56.14130(g) · $267.00 proposed penalty
Regular Safety and Health Inspection
Bonito Pit · 290245016.5 on-site hours reported
Moving machine parts.
Bonito Pit · 290245030 CFR 56.14107(a) · $398.00 proposed penalty
Protection of power conductors from mobile equipment.
Bonito Pit · 290245030 CFR 56.12005 · $883.00 proposed penalty
Construction and maintenance of guards.
Bonito Pit · 290245030 CFR 56.14112(a)(1) · $398.00 proposed penalty
Construction and maintenance of ladders.
Bonito Pit · 290245030 CFR 56.11003 · $267.00 proposed penalty
Insulation and fittings for power wires and cables.
Bonito Pit · 290245030 CFR 56.12008 · $883.00 proposed penalty
Construction and maintenance of guards.
Bonito Pit · 290245030 CFR 56.14112(a)(1) · $1,320.00 proposed penalty
Moving machine parts.
Bonito Pit · 290245030 CFR 56.14107(a) · $398.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.