Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Best Sand - Chardon3300015 · Active6/8 quarters reported | Geauga, OHSurface · MSHA: Ground Silica | 0 | 146,049 | 17 | 1 | 122.5 |
| Cleburne Plant4101059 · Active6/8 quarters reported | Somervell, TXSurface · MSHA: Sand, Industrial NEC | 0 | 88,673 | 20 | 0 | 62.8 |
| Dividing Creek Plant2800605 · Active6/8 quarters reported | Cumberland, NJSurface · MSHA: Construction Sand and Gravel | 0 | 95,859 | 13 | 1 | 50.0 |
| Elco Plant1101981 · Active6/8 quarters reported | Alexander, ILFacility · MSHA: Quartz, Ground | 0 | 104,789 | 4 | 1 | 66.5 |
| Emmett Plant1000318 · Active6/8 quarters reported | Gem, IDFacility · MSHA: Misc. Nonmetallic Mnls. NEC | 0 | 51,284 | 3 | 1 | 34.8 |
| Fort Smith Plant0301607 · Active6/8 quarters reported | Sebastian, ARFacility · MSHA: Sand, Industrial NEC | 0 | 194,453 | 36 | 3 | 148.3 |
| Guion Plant0300313 · Active6/8 quarters reported | Izard, ARUnderground · MSHA: Crushed, Broken Sandstone | 0 | 128,535 | 33 | 4 | 283.8 |
| Hephzibah Plant0900149 · Active6/8 quarters reported | Richmond, GASurface · MSHA: Kaolin and Ball Clay | 0 | 127,846 | 6 | 4 | 66.5 |
| Huntingburg Mill1201932 · Active6/8 quarters reported | Dubois, INSurface · MSHA: Clay, Ceramic, Refractory Mnls. | 0 | 17,956 | 0 | 0 | 54.5 |
| Junction City Plant0900726 · Active6/8 quarters reported | Marion, GASurface · MSHA: Construction Sand and Gravel | 0 | 135,659 | 9 | 4 | 66.3 |
| Lugoff Plant3800299 · Active6/8 quarters reported | Kershaw, SCSurface · MSHA: Sand, Industrial NEC | 0 | 86,004 | 7 | 0 | 87.0 |
| Marston Plant3101518 · Active6/8 quarters reported | Richmond, NCSurface · MSHA: Ground Silica | 0 | 138,959 | 1 | 1 | 91.5 |
| McIntyre Plant0900128 · Active5/8 quarters reported | Wilkinson, GASurface · MSHA: Kaolin and Ball Clay | 0 | 51,373 | 12 | 1 | 41.3 |
| Menomonie Plant4703512 · Active6/8 quarters reported | Dunn, WISurface · MSHA: Sand, Industrial NEC | 0 | 36,341 | 1 | 0 | 47.8 |
| Oregon Plant1101579 · Active6/8 quarters reported | Ogle, ILSurface · MSHA: Crushed, Broken Sandstone | 0 | 154,458 | 18 | 2 | 181.0 |
| Ottawa Plant2100790 · Active6/8 quarters reported | Le Sueur, MNSurface · MSHA: Crushed, Broken Sandstone | 0 | 61,291 | 23 | 0 | 125.0 |
| Pevely Plant2300706 · Active6/8 quarters reported | Jefferson, MOSurface · MSHA: Sand, Industrial NEC | 0 | 29,897 | 5 | 0 | 53.3 |
| Portage Plant4700749 · Active6/8 quarters reported | Columbia, WISurface · MSHA: Sand, Industrial NEC | 0 | 48,763 | 8 | 0 | 70.8 |
| Roff Plant3400304 · Active6/8 quarters reported | Pontotoc, OKSurface · MSHA: Crushed, Broken Sandstone | 0 | 108,989 | 7 | 1 | 53.3 |
| Tamms Plant1102051 · Active6/8 quarters reported | Alexander, ILFacility · MSHA: Misc. Metal Ore NEC | 0 | 40,051 | 1 | 1 | 38.3 |
| Thompson Mine3301944 · Active6/8 quarters reported | Geauga, OHSurface · MSHA: Ground Silica | 0 | 118,211 | 26 | 2 | 130.5 |
| TROUP PLANT4103483 · Active6/8 quarters reported | Cherokee, TXFacility · MSHA: Common Clays NEC | 0 | 58,941 | 16 | 2 | 49.5 |
| Troy Grove Plant1101580 · Active6/8 quarters reported | La Salle, ILSurface · MSHA: Sand, Industrial NEC | 0 | 38,421 | 6 | 2 | 37.8 |
| TUSCALOOSA PLANT0100697 · Active6/8 quarters reported | Tuscaloosa, ALSurface · MSHA: Construction Sand and Gravel | 0 | 40,282 | 0 | 0 | 36.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
24 of 24 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 24 mines listed under this controller were checked; 24 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 347,847 | 0.00 | 687 | 24/24 mines reporting |
| 2025 Q2 | 0 | 358,520 | 0.00 | 685 | 24/24 mines reporting |
| 2025 Q3 | 0 | 361,323 | 0.00 | 687 | 24/24 mines reporting |
| 2025 Q4 | 0 | 326,443 | 0.00 | 673 | 24/24 mines reporting |
| 2026 Q1 | 0 | 355,958 | 0.00 | 700 | 24/24 mines reporting |
| 2026 Q2 | 0 | 352,993 | 0.00 | 679 | 23/24 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
26 significant & substantial (S&S)
0 records classified as fatality
266 of 272 violations with amounts
144 inspections · 144 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 41 | 4 | 18,728.00 | 3 | 0 | 23 | 334.3 |
| 2025-Q2 | 52 | 6 | 12,332.00 | 4 | 0 | 17 | 292.3 |
| 2025-Q3 | 28 | 2 | 4,953.00 | 6 | 0 | 26 | 243.8 |
| 2025-Q4 | 36 | 1 | 10,522.00 | 5 | 0 | 18 | 330.8 |
| 2026-Q1 | 18 | 1 | 3,546.00 | 5 | 0 | 18 | 246.5 |
| 2026-Q2 | 50 | 4 | 10,217.00 | 4 | 0 | 24 | 337.0 |
| 2026-Q3 | 47 | 8 | 9,741.00 | 4 | 0 | 18 | 214.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
41.12 · $151.00 proposed
56.12032 · $209.00 proposed
56.11012 · $151.00 proposed
Spot Inspection · 20.3 on-site hours
Compliance Follow-up Inspection · 4.0 on-site hours
Spot Inspection · 6.3 on-site hours
Spot Inspection · 4.0 on-site hours
Spot Inspection · 1.5 on-site hours
Spot Inspection · 3.0 on-site hours
Spot Inspection · 11.3 on-site hours
Regular Safety and Health Inspection · 6.5 on-site hours
56.20003(b) · $151.00 proposed
56.12004 · $151.00 proposed
HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY
Two maintenance employees were adding a return roller and brackets to BC-124. While putting the roller into the brackets one side went in with ease. That employee then went to help EE's partner by lifting the belt. The struggling employee hit the roller with EE's had causing it to fall out of the bracket and land on the side of EE's boot fracturing EE's pinky toe
Regular Safety and Health Inspection · 5.5 on-site hours
56.4601 · $313.00 proposed
56.12023 · $313.00 proposed
56.12019 · $151.00 proposed
Regular Safety and Health Inspection · 34.8 on-site hours
Verbal Hazard Complaint Inspections · 1.8 on-site hours
HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY
While attempting to loosen an air hose on a rail car with a 24" pipe wrench FLW overexerted self and irritated an existing condition. Incident resulted in a sprain/ strain injury to the right arm requiring modified duty work restrictions. Follow-up is required.
48.9(a) · $151.00 proposed
57.12023 · $151.00 proposed
57.12032 · $151.00 proposed
SLIP OR FALL OF PERSON · DAYS RESTRICTED ACTIVITY ONLY
Employee was stepping over a wash hose and caught the heel of EE's boot causing EE to fall onto EE's left knee.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.