ACTIVE / CONTROLLER PORTFOLIO

Coronado Coal LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0109921

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Buchanan Mine #14404856 · Active6/8 quarters reportedBuchanan, VAUnderground · MSHA: Coal (Bituminous)6,221,6162,462,240735878,663.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

735

137 significant & substantial (S&S)

  1. 2025 Q154
  2. 2025 Q278
  3. 2025 Q391
  4. 2025 Q4143
  5. 2026 Q197
  6. 2026 Q2105
  7. 2026 Q3130
  8. 2026 Q4 *37

Accident records

87

0 records classified as fatality

  1. 2025 Q110
  2. 2025 Q29
  3. 2025 Q314
  4. 2025 Q410
  5. 2026 Q114
  6. 2026 Q216
  7. 2026 Q314
  8. 2026 Q4 *0

Proposed penalties · USD

503,141.00

666 of 735 violations with amounts

  1. 2025 Q152,170
  2. 2025 Q259,167
  3. 2025 Q392,955
  4. 2025 Q485,539
  5. 2026 Q1107,128
  6. 2026 Q272,887
  7. 2026 Q333,295
  8. 2026 Q4 *—

On-site inspection hours

8,663.75

162 inspections · 162 with hours

  1. 2025 Q11,000.50
  2. 2025 Q21,118.50
  3. 2025 Q31,125.25
  4. 2025 Q41,222.00
  5. 2026 Q11,246.75
  6. 2026 Q21,387.00
  7. 2026 Q31,418.75
  8. 2026 Q4 *145.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1541052,170.00100201,000.5
2025-Q2781959,167.0090231,118.5
2025-Q3911592,955.00140211,125.3
2025-Q41432085,539.00100231,222.0
2026-Q19729107,128.00140211,246.8
2026-Q21052572,887.00160251,387.0
2026-Q31301433,295.00140251,418.8
2026-Q4 *375—004145.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9271792
    Buchanan Mine #1 · 4404856

    77.205(b) · $151.00 proposed

  2. violation9216795
    Buchanan Mine #1 · 4404856

    75.370(a)(1) · $818.00 proposed

  3. violation9216794
    Buchanan Mine #1 · 4404856

    75.333(c)(3) · $267.00 proposed

  4. violation9216793
    Buchanan Mine #1 · 4404856

    75.380(g) · $267.00 proposed

  5. violation9216792
    Buchanan Mine #1 · 4404856

    75.351(c)(4) · $151.00 proposed

  6. violation9216790
    Buchanan Mine #1 · 4404856

    75.370(a)(1) · $592.00 proposed

  7. inspectionF00F5FF
    Buchanan Mine #1 · 4404856

    103(i) Spot Inspections · 6.5 on-site hours

  8. accident220262530010
    Buchanan Mine #1 · 4404856

    MACHINERY · PERM TOT OR PERM PRTL DISABLTY

    Accident narrative

    Based on the investigation and witness testimony, the employee was installing EE's 2nd rib bolt in the 2nd row of the #2 entry on 18 East Tail. While retracting the drill pot, EE placed EE's hand on the bottom outby side of the mast. When the mast bottomed out, it pinched EE's left index finger, amputating the tip just behind the nail bed.

  9. violation9271791
    Buchanan Mine #1 · 4404856

    75.512 · $313.00 proposed

  10. inspectionF024AA7
    Buchanan Mine #1 · 4404856

    103(i) Spot Inspections · 6.3 on-site hours

  11. violation9270400
    Buchanan Mine #1 · 4404856

    75.1911(d) · $151.00 proposed

  12. accident220262510017
    Buchanan Mine #1 · 4404856

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    The employee had taped up a small cut in a belt control cable on 18 East Head. While holding the roll of tape in right hand, they cut the tape with a razor knife in their left hand. As they cut the tape, they slipped and cut their left index finger on their right hand, requiring 3 sutures to close the wound

  13. violation9271251
    Buchanan Mine #1 · 4404856

    75.1403

  14. inspectionF007750
    Buchanan Mine #1 · 4404856

    103(i) Spot Inspections · 4.5 on-site hours

  15. violation8309338
    Buchanan Mine #1 · 4404856

    75.342(a)(4) · $151.00 proposed

  16. violation9882351
    Buchanan Mine #1 · 4404856

    75.403 · $313.00 proposed

  17. violation9216791
    Buchanan Mine #1 · 4404856

    75.380(g) · $697.00 proposed

  18. violation8309337
    Buchanan Mine #1 · 4404856

    75.403 · $151.00 proposed

  19. violation8309336
    Buchanan Mine #1 · 4404856

    75.403 · $151.00 proposed

  20. violation8309335
    Buchanan Mine #1 · 4404856

    75.403 · $151.00 proposed

  21. inspectionF01A20D
    Buchanan Mine #1 · 4404856

    Verbal Hazard Complaint Inspections · 7.0 on-site hours

  22. violation9216786
    Buchanan Mine #1 · 4404856

    75.403 · $549.00 proposed

  23. violation9216785
    Buchanan Mine #1 · 4404856

    75.1100-2(b) · $177.00 proposed

  24. violation9216784
    Buchanan Mine #1 · 4404856

    75.1722(b) · $267.00 proposed

  25. violation9216783
    Buchanan Mine #1 · 4404856

    75.515 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Buchanan Mine #14404856 · Buchanan, Virginia3,874,816———County sales or price not published6 eligible mines / 6 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.