Coal production
133,613,189reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Bailey Mine3607230 · Active6/8 quarters reported | Greene, PAUnderground · MSHA: Coal (Bituminous) | 17,629,602 | 2,611,012 | 1,229 | 106 | 10,923.5 |
| BECKLEY POCAHONTAS MINE4605252 · Active6/8 quarters reported | Raleigh, WVUnderground · MSHA: Coal (Bituminous) | 1,788,402 | 1,258,929 | 741 | 20 | 5,914.5 |
| Beckley Pocahontas Plant4609216 · Active6/8 quarters reported | Raleigh, WVFacility · MSHA: Coal (Bituminous) | 0 | 99,192 | 10 | 1 | 226.5 |
| Black Thunder4800977 · Active6/8 quarters reported | Campbell, WYSurface · MSHA: Coal (Bituminous) | 70,462,955 | 2,525,675 | 176 | 23 | 917.3 |
| Cardinal Preparation Plant4609046 · Active6/8 quarters reported | Logan, WVFacility · MSHA: Coal (Bituminous) | 0 | 80,434 | 29 | 1 | 260.5 |
| Coal Creek Mine4801215 · Active6/8 quarters reported | Campbell, WYSurface · MSHA: Coal (Bituminous) | 2,572,759 | 107,835 | 26 | 0 | 237.8 |
| ENLOW FORK MINE3607416 · Active6/8 quarters reported | Washington, PAUnderground · MSHA: Coal (Bituminous) | 15,038,810 | 1,799,445 | 460 | 41 | 8,544.3 |
| HARVEY MINE3610045 · Active6/8 quarters reported | Greene, PAUnderground · MSHA: Coal (Bituminous) | 8,307,083 | 1,107,372 | 285 | 27 | 5,320.0 |
| Itmann No 54609569 · Active6/8 quarters reported | Wyoming, WVUnderground · MSHA: Coal (Bituminous) | 650,612 | 419,529 | 551 | 14 | 2,538.5 |
| Itmann No.5 Plant4609598 · Active6/8 quarters reported | Wyoming, WVFacility · MSHA: Coal (Bituminous) | 0 | 78,644 | 15 | 1 | 111.0 |
| LEER MINE4609192 · Active6/8 quarters reported | Taylor, WVUnderground · MSHA: Coal (Bituminous) | 6,991,302 | 1,840,279 | 424 | 32 | 4,435.5 |
| Leer Prep Plant4609191 · Active6/8 quarters reported | Taylor, WVFacility · MSHA: Coal (Bituminous) | 0 | 158,911 | 14 | 2 | 232.8 |
| Leer South Mine4604168 · Active6/8 quarters reported | Barbour, WVUnderground · MSHA: Coal (Bituminous) | 2,428,464 | 1,340,582 | 508 | 27 | 6,576.0 |
| Leer South Preparation Plant4608777 · Active6/8 quarters reported | Barbour, WVFacility · MSHA: Coal (Bituminous) | 0 | 156,565 | 15 | 0 | 193.5 |
| Mountaineer II Mine4609029 · Active6/8 quarters reported | Logan, WVUnderground · MSHA: Coal (Bituminous) | 1,811,088 | 1,173,667 | 950 | 19 | 5,541.8 |
| West Elk Mine0503672 · Active6/8 quarters reported | Gunnison, COUnderground · MSHA: Coal (Bituminous) | 5,932,112 | 858,989 | 482 | 19 | 4,555.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
16 of 16 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 16 mines listed under this controller were checked; 16 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 22,423,429 | 2,778,532 | 8.07 | 4,883 | 16/16 mines reporting |
| 2025 Q2 | 22,869,293 | 2,723,879 | 8.40 | 4,900 | 16/16 mines reporting |
| 2025 Q3 | 22,755,103 | 2,602,169 | 8.74 | 4,631 | 16/16 mines reporting |
| 2025 Q4 | 22,210,759 | 2,452,688 | 9.06 | 4,507 | 16/16 mines reporting |
| 2026 Q1 | 22,003,325 | 2,559,209 | 8.60 | 4,473 | 16/16 mines reporting |
| 2026 Q2 | 21,351,280 | 2,500,583 | 8.54 | 4,413 | 16/16 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
685 significant & substantial (S&S)
2 records classified as fatality
5,398 of 5,915 violations with amounts
1,656 inspections · 1,656 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 856 | 90 | 832,281.00 | 33 | 0 | 196 | 9,672.0 |
| 2025-Q2 | 830 | 87 | 739,652.00 | 47 | 0 | 231 | 8,375.8 |
| 2025-Q3 | 854 | 68 | 428,583.00 | 44 | 0 | 234 | 8,180.3 |
| 2025-Q4 | 650 | 44 | 283,982.00 | 46 | 0 | 200 | 7,049.5 |
| 2026-Q1 | 879 | 119 | 669,526.00 | 51 | 0 | 226 | 7,310.8 |
| 2026-Q2 | 902 | 146 | 561,950.00 | 59 | 1 | 261 | 7,937.0 |
| 2026-Q3 | 809 | 115 | 352,187.00 | 53 | 1 | 260 | 7,268.5 |
| 2026-Q4 * | 135 | 16 | — | 0 | 0 | 48 | 735.0 |
All violations issued in the selected period. Counts combine subsections.
75.604(b) · $549.00 proposed
75.503 · $193.00 proposed
75.503 · $432.00 proposed
75.1403 · $267.00 proposed
75.512 · $151.00 proposed
75.517 · S&S · $4,047.00 proposed
75.512 · $209.00 proposed
75.364(b)(2) · $151.00 proposed
75.1107-16(b) · $267.00 proposed
75.220(a)(1) · $193.00 proposed
FALL OF ROOF OR BACK · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was side bolting when a rock fell from above the rib protector striking EE causing lacerations. EE was treated with sutures to close the lacerations. EE was released to work EE's next scheduled shift.
FALL OF ROOF OR BACK · ACCIDENT ONLY
Roof fall located in #1 Entry (Return Entry) between 13 to 14 Block. The dimensions were approximately 60'x19'x8'. No injuries occurred from this incident.
Verbal Hazard Complaint Inspections · 14.0 on-site hours
Roof Control Technical Investigation · 38.0 on-site hours
Health Technical Investigation · 11.0 on-site hours
Impoundment Spot Inspection · 4.3 on-site hours
103(i) Spot Inspections · 13.0 on-site hours
75.400 · $165.00 proposed
75.503 · $151.00 proposed
75.202(a) · $151.00 proposed
75.370(a)(1) · $3,736.00 proposed
75.512 · $151.00 proposed
75.380(d)(1) · S&S · $2,936.00 proposed
75.360(g) · $151.00 proposed
75.1722(a) · $642.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA source checks are overdue. Refresh receipts before serving this report.
Annual coal-price source checks are overdue. Refresh before serving estimates.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.