Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Barrett Paving Materials Inc3304255 · Active6/8 quarters reported | Clark, OHSurface · MSHA: Construction Sand and Gravel | 0 | 35,419 | 4 | 0 | 56.5 |
| Barrett Paving Materials Inc3300115 · Active6/8 quarters reported | Shelby, OHSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 35,526 | 5 | 1 | 71.5 |
| Barrett Paving Mats Inc-West Carrollton3301513 · Active6/8 quarters reported | Montgomery, OHSurface · MSHA: Construction Sand and Gravel | 0 | 34,087 | 6 | 1 | 54.0 |
| Blacksburg Quarry3800729 · Active6/8 quarters reported | Cherokee, SCSurface · MSHA: Crushed, Broken Granite | 0 | 56,265 | 11 | 0 | 73.0 |
| Crusher #14801540 · Active6/8 quarters reported | Laramie, WYSurface · MSHA: Crushed, Broken Stone NEC | 0 | 87,753 | 12 | 3 | 50.8 |
| Dexter Sand & Gravel2302430 · Active6/8 quarters reported | Stoddard, MOSurface · MSHA: Construction Sand and Gravel | 0 | 16,837 | 0 | 2 | 24.8 |
| Hardin Sand and Gravel3302129 · Active6/8 quarters reported | Shelby, OHSurface · MSHA: Construction Sand and Gravel | 0 | 24,307 | 4 | 0 | 68.0 |
| Heartland Materials2302419 · Active6/8 quarters reported | Cape Girardeau, MOSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 44,136 | 3 | 0 | 49.3 |
| IRWINDALE PLANT0401763 · Active6/8 quarters reported | Los Angeles, CASurface · MSHA: Construction Sand and Gravel | 0 | 141,037 | 27 | 0 | 89.0 |
| Lewisburg3300172 · Active6/8 quarters reported | Preble, OHSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 11,512 | 1 | 0 | 15.8 |
| LITCHFIELD QUARRY3001288 · Active6/8 quarters reported | Herkimer, NYSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 31,351 | 13 | 0 | 50.3 |
| PLATTSBURGH QUARRIES3000089 · Active6/8 quarters reported | Clinton, NYSurface · MSHA: Crushed, Broken Stone NEC | 0 | 26,804 | 0 | 2 | 44.5 |
| PORTABLE #1 Fort Collins0504083 · Active6/8 quarters reported | Larimer, COSurface · MSHA: Construction Sand and Gravel | 0 | 21,812 | 10 | 0 | 24.3 |
| Portable Plant #13304541 · Active6/8 quarters reported | Miami, OHSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 25,977 | 9 | 0 | 64.0 |
| Rapid City Quarry3900014 · Active6/8 quarters reported | Pennington, SDSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 38,866 | 17 | 0 | 58.8 |
| Richmond Quarry1200022 · Active6/8 quarters reported | Wayne, INSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 50,463 | 2 | 1 | 52.8 |
| Scottsbluff Portable Barge2501203 · Active6/8 quarters reported | Scotts Bluff, NESurface · MSHA: Construction Sand and Gravel | 0 | 16,057 | 7 | 0 | 37.0 |
| Southeast Missouri Stone Company2300191 · Active6/8 quarters reported | Cape Girardeau, MOSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 96,408 | 7 | 4 | 73.5 |
| Superior Crusher #23901658 · Active6/8 quarters reported | Pennington, SDSurface · MSHA: Construction Sand and Gravel | 0 | 17,459 | 14 | 0 | 32.3 |
| WILLIAMSVILLE STONE CO2301163 · Active6/8 quarters reported | Butler, MOSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 42,439 | 4 | 1 | 38.0 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
20 of 20 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 20 mines listed under this controller were checked; 20 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 128,607 | 0.00 | 287 | 20/20 mines reporting |
| 2025 Q2 | 0 | 154,297 | 0.00 | 304 | 20/20 mines reporting |
| 2025 Q3 | 0 | 153,448 | 0.00 | 296 | 20/20 mines reporting |
| 2025 Q4 | 0 | 134,925 | 0.00 | 281 | 20/20 mines reporting |
| 2026 Q1 | 0 | 128,407 | 0.00 | 266 | 20/20 mines reporting |
| 2026 Q2 | 0 | 154,831 | 0.00 | 273 | 20/20 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
22 significant & substantial (S&S)
0 records classified as fatality
153 of 156 violations with amounts
95 inspections · 95 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 35 | 5 | 22,636.00 | 4 | 0 | 19 | 176.5 |
| 2025-Q2 | 21 | 2 | 6,091.00 | 4 | 0 | 12 | 117.3 |
| 2025-Q3 | 21 | 1 | 8,448.00 | 1 | 0 | 12 | 148.0 |
| 2025-Q4 | 11 | 2 | 1,915.00 | 1 | 0 | 5 | 74.8 |
| 2026-Q1 | 25 | 3 | 13,640.00 | 2 | 0 | 16 | 184.3 |
| 2026-Q2 | 32 | 5 | 5,468.00 | 2 | 0 | 23 | 262.8 |
| 2026-Q3 | 10 | 4 | 7,765.00 | 1 | 0 | 7 | 48.0 |
| 2026-Q4 * | 1 | 0 | — | 0 | 0 | 1 | 16.3 |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 16.3 on-site hours
56.11012
Spot Inspection · 6.8 on-site hours
46.11(a) · S&S
Spot Inspection · 9.3 on-site hours
Compliance Follow-up Inspection · 2.0 on-site hours
Compliance Follow-up Inspection · 1.0 on-site hours
56.14100(b) · $151.00 proposed
56.12032 · S&S · $959.00 proposed
56.12002 · S&S · $2,133.00 proposed
56.18002(b) · $151.00 proposed
Regular Safety and Health Inspection · 18.0 on-site hours
56.12004 · S&S · $2,712.00 proposed
56.12004 · $549.00 proposed
56.9100
Regular Safety and Health Inspection · 6.0 on-site hours
46.9(b)(5) · $151.00 proposed
Regular Safety and Health Inspection · 5.0 on-site hours
56.12004 · $959.00 proposed
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was grabbing a come along off the wall, when it slipped from EE's hand and smashed EE's hand into the door frame.
Regular Safety and Health Inspection · 15.5 on-site hours
Regular Safety and Health Inspection · 12.8 on-site hours
56.14109(b)(1) · $151.00 proposed
Regular Safety and Health Inspection · 5.0 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
A small rock blocked jammed the conveyor belt on a screening plant. When employee hit the kill button to stop the machine, a large chunk of clay rock fell and hit their RIGHT leg. Sustained fractured Tibia and Fibula and broken bones on top of foot.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.