ACTIVE / CONTROLLER PORTFOLIO

Cementir Holding; Cemex SA

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0140381

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Lehigh White Cement Company, LLC3600166 · Active6/8 quarters reportedYork, PAFacility · MSHA: Cement0144,737274104.5
Waco Plant4100079 · Active6/8 quarters reportedMclennan, TXFacility · MSHA: Cement0198,818488122.0

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

75

20 significant & substantial (S&S)

  1. 2025 Q112
  2. 2025 Q212
  3. 2025 Q311
  4. 2025 Q416
  5. 2026 Q10
  6. 2026 Q224
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

12

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q34
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q23
  7. 2026 Q33
  8. 2026 Q4 *0

Proposed penalties · USD

65,774.00

75 of 75 violations with amounts

  1. 2025 Q14,885
  2. 2025 Q29,771
  3. 2025 Q313,372
  4. 2025 Q46,916
  5. 2026 Q1—
  6. 2026 Q230,830
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

226.50

19 inspections · 19 with hours

  1. 2025 Q140.25
  2. 2025 Q228.75
  3. 2025 Q331.50
  4. 2025 Q452.25
  5. 2026 Q1—
  6. 2026 Q273.75
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11234,885.0000340.3
2025-Q21239,771.0010328.8
2025-Q311813,372.0040431.5
2025-Q41626,916.0000352.3
2026-Q100—100—
2026-Q224430,830.0030673.8
2026-Q300—300—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF018F4C
    Waco Plant · 4100079

    Verbal Hazard Complaint Inspections · 10.0 on-site hours

  2. inspectionF018F49
    Waco Plant · 4100079

    Verbal Hazard Complaint Inspections · 18.8 on-site hours

  3. violation5003444
    Waco Plant · 4100079

    56.12004 · S&S · $697.00 proposed

  4. violation5003443
    Waco Plant · 4100079

    56.12004 · S&S · $697.00 proposed

  5. violation5003442
    Waco Plant · 4100079

    56.14107(a) · $209.00 proposed

  6. accident220251390005
    Waco Plant · 4100079

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    While installing a deflection shield for under the redimat, employee was notching the belt to fit correctly around the gate foot with a box cutter. Cutting towards the foot/body, the box cutter slipped and cut employee through EE's work boot and cut into inside part of EE's R foot. Seeked medical care and no stitches or restrictions.

  7. inspectionF01724A
    Waco Plant · 4100079

    Compliance Follow-up Inspection · 0.0 on-site hours

  8. violation5002458
    Waco Plant · 4100079

    56.11003 · $245.00 proposed

  9. violation5002457
    Waco Plant · 4100079

    56.14107(a) · $245.00 proposed

  10. violation5002456
    Waco Plant · 4100079

    56.14107(a) · $245.00 proposed

  11. violation5002455
    Waco Plant · 4100079

    56.14211(c) · S&S · $5,144.00 proposed

  12. violation5002454
    Waco Plant · 4100079

    56.20003(a) · $313.00 proposed

  13. violation5002453
    Waco Plant · 4100079

    56.12028 · $313.00 proposed

  14. violation5002452
    Waco Plant · 4100079

    56.12032 · $1,037.00 proposed

  15. violation5002451
    Waco Plant · 4100079

    56.12006 · $313.00 proposed

  16. violation5002450
    Waco Plant · 4100079

    56.12006 · $313.00 proposed

  17. inspectionF017247
    Waco Plant · 4100079

    Regular Safety and Health Inspection · 17.0 on-site hours

  18. violation5002449
    Waco Plant · 4100079

    56.14107(a) · S&S · $2,312.00 proposed

  19. violation5002448
    Waco Plant · 4100079

    56.16006 · $313.00 proposed

  20. violation5002447
    Waco Plant · 4100079

    56.12028 · $313.00 proposed

  21. violation5002446
    Waco Plant · 4100079

    56.14207 · $465.00 proposed

  22. violation5002445
    Waco Plant · 4100079

    50.30-1(h) · $151.00 proposed

  23. inspectionF015856
    Lehigh White Cement Company, LLC · 3600166

    Compliance Follow-up Inspection · 1.0 on-site hours

  24. violation9807499
    Lehigh White Cement Company, LLC · 3600166

    56.12018 · $151.00 proposed

  25. violation9807498
    Lehigh White Cement Company, LLC · 3600166

    56.20003(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.