ACTIVE / CONTROLLER PORTFOLIO

Black Hills Corp

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC03845

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Wyodak Mine4800083 · Active6/8 quarters reportedCampbell, WYSurface · MSHA: Coal (Bituminous)5,010,323134,957221290.3

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

22

2 significant & substantial (S&S)

  1. 2025 Q12
  2. 2025 Q20
  3. 2025 Q36
  4. 2025 Q41
  5. 2026 Q16
  6. 2026 Q20
  7. 2026 Q37
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

3,322.00

22 of 22 violations with amounts

  1. 2025 Q1302
  2. 2025 Q2—
  3. 2025 Q3906
  4. 2025 Q4151
  5. 2026 Q1906
  6. 2026 Q2—
  7. 2026 Q31,057
  8. 2026 Q4 *—

On-site inspection hours

290.25

6 inspections · 6 with hours

  1. 2025 Q172.75
  2. 2025 Q2—
  3. 2025 Q378.50
  4. 2025 Q40.00
  5. 2026 Q182.25
  6. 2026 Q2—
  7. 2026 Q356.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q120302.0000172.8
2025-Q200—000—
2025-Q360906.0000178.5
2025-Q410151.000010.0
2026-Q160906.0000282.3
2026-Q200—000—
2026-Q3721,057.0010156.8
2026-Q4 *00—000—
Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS2,508,06739 rows · 5 receiving plants
HEAT CONTENT · BTU/LB7,988Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.50 / 6.48Separate averages over measured receipts
DELIVERED COST · USD/TON21.8482.3% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *558,0968,0450.526.6221.19
2025-Q4829,0417,9800.516.4821.03
2026-Q1510,1257,9510.496.4622.74
2026-Q2415,5147,9790.486.3623.04
2026-Q3 *195,2917,9750.476.4422.82
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12114 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK COAL MINE152,46022.827,9850.476.40ContractSUBTram/conveyor
2026-07EIA row 12952 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE42,831—Not published7,9400.496.60ContractSUBTram/conveyor
2026-06EIA row 10206 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK109,25922.458,0020.486.40ContractSUBTram/conveyor
2026-06EIA row 11004 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE39,128—Not published7,8950.506.60ContractSUBTram/conveyor
2026-05EIA row 8352 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK117,04523.347,9940.486.20ContractSUBTram/conveyor
2026-05EIA row 9101 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE21,593—Not published7,9150.497.10ContractSUBTram/conveyor
2026-04EIA row 6546 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK92,46323.367,9990.506.30ContractSUBTram/conveyor
2026-04EIA row 7323 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE36,026—Not published7,9450.446.20ContractSUBTram/conveyor
2026-03EIA row 4721 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK97,28923.047,9550.486.60ContractSUBTram/conveyor
2026-03EIA row 5505 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE37,152—Not published7,9850.466.40ContractSUBTram/conveyor
2026-02EIA row 2789 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK148,24122.967,9540.476.20ContractSUBTram/conveyor
2026-02EIA row 3633 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE34,297—Not published7,9400.516.60ContractSUBTram/conveyor
2026-01EIA row 808 · preliminaryWYODAK MINE4800083Wyodak6101 · WY · WYODAK153,62922.347,9570.526.60ContractSUBTram/conveyor
2026-01EIA row 1680 · preliminaryWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE39,517—Not published7,8800.496.50ContractSUBTram/conveyor
2025-12EIA row 34845 · finalWYODAK MINE4800083Wyodak6101 · WY · WYODAK172,50222.377,9680.526.40ContractSUBTram/conveyor
2025-12EIA row 35062 · finalWYODAK MINE4800083Neil Simpson II7504 · WY · WYODAK RESOURCES34,98816.428,0500.526.70ContractSUBTram/conveyor
2025-12EIA row 36318 · finalWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE33,829—Not published7,8950.466.30ContractSUBTram/conveyor
2025-12EIA row 36482 · finalWYODAK MINE4800083Wygen 256319 · WY · WYODAK RESOURCES38,96616.348,0000.516.60ContractSUBTram/conveyor
2025-12EIA row 36527 · finalWYODAK MINE4800083Wygen III56596 · WY · WYODAK COAL MINE6,09316.348,0250.506.40ContractSUBTram/conveyor
2025-11EIA row 31854 · finalWYODAK MINE4800083Wyodak6101 · WY · WYODAK144,94722.848,0020.486.40ContractSUBTram/conveyor
2025-11EIA row 32044 · finalWYODAK MINE4800083Neil Simpson II7504 · WY · WYODAK RESOURCES40,86220.748,0500.526.70ContractSUBTram/conveyor
2025-11EIA row 33321 · finalWYODAK MINE4800083Wygen 155479 · WY · WYODAK COAL MINE29,761—Not published7,9750.476.40ContractSUBTram/conveyor
2025-11EIA row 33501 · finalWYODAK MINE4800083Wygen 256319 · WY · WYODAK RESOURCES45,50820.628,0000.516.60ContractSUBTram/conveyor
2025-11EIA row 33545 · finalWYODAK MINE4800083Wygen III56596 · WY · WYODAK COAL MINE7,11620.628,0250.506.40ContractSUBTram/conveyor
2025-10EIA row 28907 · finalWYODAK MINE4800083Wyodak6101 · WY · WYODAK143,33422.367,9250.536.50ContractSUBTram/conveyor
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON13.96Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS3,685,770Allocated from published county sales
ESTIMATED COAL REVENUE · USD51,453,344Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Wyodak Mine4800083 · Campbell, Wyoming3,686,04913.963,685,77051,453,344County allocation estimate2.17% of eligible county production11 eligible mines / 11 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.