Coal production
5,010,323reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Wyodak Mine4800083 · Active6/8 quarters reported | Campbell, WYSurface · MSHA: Coal (Bituminous) | 5,010,323 | 134,957 | 22 | 1 | 290.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 1 mines listed under this controller were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 900,806 | 22,887 | 39.36 | 53 | 1/1 mines reporting |
| 2025 Q2 | 729,703 | 21,959 | 33.23 | 54 | 1/1 mines reporting |
| 2025 Q3 | 882,722 | 22,174 | 39.81 | 54 | 1/1 mines reporting |
| 2025 Q4 | 832,271 | 23,225 | 35.84 | 54 | 1/1 mines reporting |
| 2026 Q1 | 811,951 | 23,366 | 34.75 | 54 | 1/1 mines reporting |
| 2026 Q2 | 852,870 | 21,346 | 39.95 | 53 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
2 significant & substantial (S&S)
0 records classified as fatality
22 of 22 violations with amounts
6 inspections · 6 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 2 | 0 | 302.00 | 0 | 0 | 1 | 72.8 |
| 2025-Q2 | 0 | 0 | — | 0 | 0 | 0 | — |
| 2025-Q3 | 6 | 0 | 906.00 | 0 | 0 | 1 | 78.5 |
| 2025-Q4 | 1 | 0 | 151.00 | 0 | 0 | 1 | 0.0 |
| 2026-Q1 | 6 | 0 | 906.00 | 0 | 0 | 2 | 82.3 |
| 2026-Q2 | 0 | 0 | — | 0 | 0 | 0 | — |
| 2026-Q3 | 7 | 2 | 1,057.00 | 1 | 0 | 1 | 56.8 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
77.1605(k) · S&S · $151.00 proposed
77.1102 · $151.00 proposed
77.1607(b) · S&S · $151.00 proposed
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Water truck operator stated EE blacked out while traveling west from the loading area. The truck traveled over the berm, tipped onto its side, slid down the pond slope, and came to rest upside down in the water. The operator regained consciousness, exited the truck, swam to shore, and walked up the hill for assistance. EE was transported to the hospital.
77.1710(a) · $151.00 proposed
77.202 · $151.00 proposed
77.1710(a) · $151.00 proposed
Regular Safety and Health Inspection · 56.8 on-site hours
77.1110 · $151.00 proposed
Compliance Follow-up Inspection · 12.3 on-site hours
77.502 · $151.00 proposed
77.502 · $151.00 proposed
77.410(b) · $151.00 proposed
47.44(b) · $151.00 proposed
77.701 · $151.00 proposed
77.807 · $151.00 proposed
Regular Safety and Health Inspection · 70.0 on-site hours
Compliance Follow-up Inspection · 0.0 on-site hours
71.206(a) · $151.00 proposed
77.208(d) · $151.00 proposed
77.505 · $151.00 proposed
77.202 · $151.00 proposed
77.502 · $151.00 proposed
77.1104 · $151.00 proposed
77.1110 · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 558,096 | 8,045 | 0.52 | 6.62 | 21.19 | |
| 2025-Q4 | 829,041 | 7,980 | 0.51 | 6.48 | 21.03 | |
| 2026-Q1 | 510,125 | 7,951 | 0.49 | 6.46 | 22.74 | |
| 2026-Q2 | 415,514 | 7,979 | 0.48 | 6.36 | 23.04 | |
| 2026-Q3 * | 195,291 | 7,975 | 0.47 | 6.44 | 22.82 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12114 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK COAL MINE | 152,460 | 22.82 | 7,985 | 0.47 | 6.40 | ContractSUB | Tram/conveyor |
| 2026-07EIA row 12952 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 42,831 | —Not published | 7,940 | 0.49 | 6.60 | ContractSUB | Tram/conveyor |
| 2026-06EIA row 10206 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 109,259 | 22.45 | 8,002 | 0.48 | 6.40 | ContractSUB | Tram/conveyor |
| 2026-06EIA row 11004 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 39,128 | —Not published | 7,895 | 0.50 | 6.60 | ContractSUB | Tram/conveyor |
| 2026-05EIA row 8352 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 117,045 | 23.34 | 7,994 | 0.48 | 6.20 | ContractSUB | Tram/conveyor |
| 2026-05EIA row 9101 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 21,593 | —Not published | 7,915 | 0.49 | 7.10 | ContractSUB | Tram/conveyor |
| 2026-04EIA row 6546 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 92,463 | 23.36 | 7,999 | 0.50 | 6.30 | ContractSUB | Tram/conveyor |
| 2026-04EIA row 7323 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 36,026 | —Not published | 7,945 | 0.44 | 6.20 | ContractSUB | Tram/conveyor |
| 2026-03EIA row 4721 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 97,289 | 23.04 | 7,955 | 0.48 | 6.60 | ContractSUB | Tram/conveyor |
| 2026-03EIA row 5505 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 37,152 | —Not published | 7,985 | 0.46 | 6.40 | ContractSUB | Tram/conveyor |
| 2026-02EIA row 2789 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 148,241 | 22.96 | 7,954 | 0.47 | 6.20 | ContractSUB | Tram/conveyor |
| 2026-02EIA row 3633 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 34,297 | —Not published | 7,940 | 0.51 | 6.60 | ContractSUB | Tram/conveyor |
| 2026-01EIA row 808 · preliminary | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 153,629 | 22.34 | 7,957 | 0.52 | 6.60 | ContractSUB | Tram/conveyor |
| 2026-01EIA row 1680 · preliminary | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 39,517 | —Not published | 7,880 | 0.49 | 6.50 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 34845 · final | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 172,502 | 22.37 | 7,968 | 0.52 | 6.40 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 35062 · final | WYODAK MINE4800083 | Neil Simpson II7504 · WY · WYODAK RESOURCES | 34,988 | 16.42 | 8,050 | 0.52 | 6.70 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 36318 · final | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 33,829 | —Not published | 7,895 | 0.46 | 6.30 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 36482 · final | WYODAK MINE4800083 | Wygen 256319 · WY · WYODAK RESOURCES | 38,966 | 16.34 | 8,000 | 0.51 | 6.60 | ContractSUB | Tram/conveyor |
| 2025-12EIA row 36527 · final | WYODAK MINE4800083 | Wygen III56596 · WY · WYODAK COAL MINE | 6,093 | 16.34 | 8,025 | 0.50 | 6.40 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 31854 · final | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 144,947 | 22.84 | 8,002 | 0.48 | 6.40 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 32044 · final | WYODAK MINE4800083 | Neil Simpson II7504 · WY · WYODAK RESOURCES | 40,862 | 20.74 | 8,050 | 0.52 | 6.70 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 33321 · final | WYODAK MINE4800083 | Wygen 155479 · WY · WYODAK COAL MINE | 29,761 | —Not published | 7,975 | 0.47 | 6.40 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 33501 · final | WYODAK MINE4800083 | Wygen 256319 · WY · WYODAK RESOURCES | 45,508 | 20.62 | 8,000 | 0.51 | 6.60 | ContractSUB | Tram/conveyor |
| 2025-11EIA row 33545 · final | WYODAK MINE4800083 | Wygen III56596 · WY · WYODAK COAL MINE | 7,116 | 20.62 | 8,025 | 0.50 | 6.40 | ContractSUB | Tram/conveyor |
| 2025-10EIA row 28907 · final | WYODAK MINE4800083 | Wyodak6101 · WY · WYODAK | 143,334 | 22.36 | 7,925 | 0.53 | 6.50 | ContractSUB | Tram/conveyor |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. All producing annual records in this selection have estimates. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Wyodak Mine4800083 · Campbell, Wyoming | 3,686,049 | 13.96 | 3,685,770 | 51,453,344 | County allocation estimate2.17% of eligible county production11 eligible mines / 11 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.