ACTIVE / CONTROLLER PORTFOLIO

Barrick Nevada Holding LLC; Newmont USA Limited

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0149763

MINE PORTFOLIO

20 of 20 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Arturo2602767 · Active6/8 quarters reportedEureka, NVSurface · MSHA: Gold Ore01,294,095121184.5
Cortez District2600827 · Active6/8 quarters reportedLander, NVSurface · MSHA: Gold Ore02,770,5428323392.0
Cortez District-Underground2602573 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore01,131,2961176610.0
El Nino2602830 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore0203,911511207.3
Emigrant2602697 · Active6/8 quarters reportedElko, NVSurface · MSHA: Gold Ore09,6745195.8
Exodus2602661 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore0712,625962396.5
Genesis2600062 · Active6/8 quarters reportedEureka, NVSurface · MSHA: Gold Ore0221,89433281.8
Goldrush2602822 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore01,037,87112415674.3
Goldstrike Mine2601089 · Active6/8 quarters reportedEureka, NVSurface · MSHA: Gold Ore0243,5311510120.8
Leeville2602512 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore01,966,011371101,214.0
Long Canyon2602778 · Active6/8 quarters reportedElko, NVSurface · MSHA: Gold Ore032,7461025.5
Meikle Mine2602246 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore01,817,651358171,179.5
Mill 62602678 · Active6/8 quarters reportedEureka, NVFacility · MSHA: Gold Ore0726,003647183.5
Mill/Autoclave Operations2602674 · Active6/8 quarters reportedEureka, NVFacility · MSHA: Gold Ore0849,0011909366.5
Pete Bajo2602689 · Active6/8 quarters reportedEureka, NVUnderground · MSHA: Gold Ore0641,2111418597.3
Phoenix Mine2600550 · Active6/8 quarters reportedLander, NVSurface · MSHA: Gold Ore01,500,1058014285.0
Roaster Operations2602673 · Active6/8 quarters reportedEureka, NVFacility · MSHA: Gold Ore0507,2131024295.8
South Area2600500 · Active6/8 quarters reportedEureka, NVSurface · MSHA: Gold Ore01,405,42712325450.8
Turquoise Ridge2602286 · Active6/8 quarters reportedHumboldt, NVUnderground · MSHA: Gold Ore01,465,18427023900.0
Twin Creeks Mine2601942 · Active6/8 quarters reportedHumboldt, NVSurface · MSHA: Gold Ore01,205,477549296.5

LOCATION

Portfolio map

20 of 20 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

2,290

188 significant & substantial (S&S)

  1. 2025 Q1416
  2. 2025 Q2350
  3. 2025 Q3326
  4. 2025 Q4267
  5. 2026 Q1401
  6. 2026 Q2201
  7. 2026 Q3298
  8. 2026 Q4 *31

Accident records

197

1 records classified as fatality

  1. 2025 Q130
  2. 2025 Q221
  3. 2025 Q331
  4. 2025 Q424
  5. 2026 Q130
  6. 2026 Q232
  7. 2026 Q329
  8. 2026 Q4 *0

Proposed penalties · USD

2,382,143.00

2,151 of 2,290 violations with amounts

  1. 2025 Q1407,751
  2. 2025 Q2270,857
  3. 2025 Q3364,046
  4. 2025 Q4208,605
  5. 2026 Q1555,319
  6. 2026 Q2313,891
  7. 2026 Q3261,674
  8. 2026 Q4 *—

On-site inspection hours

8,457.00

378 inspections · 378 with hours

  1. 2025 Q11,286.25
  2. 2025 Q21,086.50
  3. 2025 Q31,258.50
  4. 2025 Q4922.50
  5. 2026 Q11,424.00
  6. 2026 Q21,100.50
  7. 2026 Q31,323.25
  8. 2026 Q4 *55.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q141631407,751.00300531,286.3
2025-Q235026270,857.00210481,086.5
2025-Q332634364,046.00311521,258.5
2025-Q426716208,605.0024036922.5
2026-Q140127555,319.00300611,424.0
2026-Q220119313,891.00320461,100.5
2026-Q329833261,674.00290691,323.3
2026-Q4 *312—001355.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5104902
    Pete Bajo · 2602689

    57.3360 · $432.00 proposed

  2. violation5104645
    Pete Bajo · 2602689

    57.12018 · $245.00 proposed

  3. accident220260200027
    Meikle Mine · 2602246

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    The injured employee was installing Purlin on the Ren Shaft Hoist House when the Purlin rolled, the employee reached to stop it and was cut on the left arm/wrist above the glove.

  4. accident220260610018
    Mill/Autoclave Operations · 2602674

    SLIP OR FALL OF PERSON · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    EE was walking across the parking lot to the autoclave when they slipped on snow covered ice, falling and landing on right shoulder. Their shoulder continued to hurt, and on 2/25 they were diagnosed with a soft-tissue tear, making this reportable for treatment. The EE resigned and left NGM, their last day was 2/26.

  5. violation5168029
    Exodus · 2602661

    57.11051(b) · $1,968.00 proposed

  6. violation5168028
    Exodus · 2602661

    57.11051(b) · $1,968.00 proposed

  7. violation5109507
    Pete Bajo · 2602689

    57.14100(b) · $432.00 proposed

  8. violation5109506
    Pete Bajo · 2602689

    57.14100(c) · $3,184.00 proposed

  9. violation5109505
    Pete Bajo · 2602689

    57.20013 · $151.00 proposed

  10. violation5104900
    Pete Bajo · 2602689

    57.3360 · $504.00 proposed

  11. violation5104899
    Pete Bajo · 2602689

    57.3360 · $504.00 proposed

  12. violation5104898
    Pete Bajo · 2602689

    57.20011 · $288.00 proposed

  13. violation5104897
    Pete Bajo · 2602689

    57.3360 · $504.00 proposed

  14. violation5104896
    Pete Bajo · 2602689

    57.3360 · $504.00 proposed

  15. violation5104644
    Pete Bajo · 2602689

    57.15001 · $151.00 proposed

  16. violation5104643
    Pete Bajo · 2602689

    57.3360 · $1,126.00 proposed

  17. inspection6965165
    Exodus · 2602661

    Compliance Follow-up Inspection · 1.0 on-site hours

  18. violation5105176
    Exodus · 2602661

    57.8529 · $209.00 proposed

  19. violation5105175
    Exodus · 2602661

    57.11051(a) · $209.00 proposed

  20. violation5104895
    Pete Bajo · 2602689

    57.4102 · $818.00 proposed

  21. violation5104894
    Pete Bajo · 2602689

    57.3360 · $1,126.00 proposed

  22. violation5104893
    Pete Bajo · 2602689

    57.3360 · $504.00 proposed

  23. violation5104642
    Pete Bajo · 2602689

    57.4102 · $818.00 proposed

  24. violation5104641
    Pete Bajo · 2602689

    57.8520 · $288.00 proposed

  25. violation5109031
    El Nino · 2602830

    57.16005 · $366.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.