Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Arturo2602767 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 1,294,095 | 12 | 11 | 84.5 |
| Cortez District2600827 · Active6/8 quarters reported | Lander, NVSurface · MSHA: Gold Ore | 0 | 2,770,542 | 83 | 23 | 392.0 |
| Cortez District-Underground2602573 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,131,296 | 117 | 6 | 610.0 |
| El Nino2602830 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 203,911 | 51 | 1 | 207.3 |
| Emigrant2602697 · Active6/8 quarters reported | Elko, NVSurface · MSHA: Gold Ore | 0 | 9,674 | 5 | 1 | 95.8 |
| Exodus2602661 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 712,625 | 96 | 2 | 396.5 |
| Genesis2600062 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 221,894 | 33 | 2 | 81.8 |
| Goldrush2602822 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,037,871 | 124 | 15 | 674.3 |
| Goldstrike Mine2601089 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 243,531 | 15 | 10 | 120.8 |
| Leeville2602512 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,966,011 | 371 | 10 | 1,214.0 |
| Long Canyon2602778 · Active6/8 quarters reported | Elko, NVSurface · MSHA: Gold Ore | 0 | 32,746 | 1 | 0 | 25.5 |
| Meikle Mine2602246 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 1,817,651 | 358 | 17 | 1,179.5 |
| Mill 62602678 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 726,003 | 64 | 7 | 183.5 |
| Mill/Autoclave Operations2602674 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 849,001 | 190 | 9 | 366.5 |
| Pete Bajo2602689 · Active6/8 quarters reported | Eureka, NVUnderground · MSHA: Gold Ore | 0 | 641,211 | 141 | 8 | 597.3 |
| Phoenix Mine2600550 · Active6/8 quarters reported | Lander, NVSurface · MSHA: Gold Ore | 0 | 1,500,105 | 80 | 14 | 285.0 |
| Roaster Operations2602673 · Active6/8 quarters reported | Eureka, NVFacility · MSHA: Gold Ore | 0 | 507,213 | 102 | 4 | 295.8 |
| South Area2600500 · Active6/8 quarters reported | Eureka, NVSurface · MSHA: Gold Ore | 0 | 1,405,427 | 123 | 25 | 450.8 |
| Turquoise Ridge2602286 · Active6/8 quarters reported | Humboldt, NVUnderground · MSHA: Gold Ore | 0 | 1,465,184 | 270 | 23 | 900.0 |
| Twin Creeks Mine2601942 · Active6/8 quarters reported | Humboldt, NVSurface · MSHA: Gold Ore | 0 | 1,205,477 | 54 | 9 | 296.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
20 of 20 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 20 mines listed under this controller were checked; 20 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 3,330,594 | 0.00 | 6,539 | 20/20 mines reporting |
| 2025 Q2 | 0 | 3,415,549 | 0.00 | 6,680 | 20/20 mines reporting |
| 2025 Q3 | 0 | 3,295,773 | 0.00 | 6,491 | 20/20 mines reporting |
| 2025 Q4 | 0 | 3,461,007 | 0.00 | 6,613 | 20/20 mines reporting |
| 2026 Q1 | 0 | 3,271,491 | 0.00 | 6,760 | 20/20 mines reporting |
| 2026 Q2 | 0 | 2,967,054 | 0.00 | 6,835 | 20/20 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
188 significant & substantial (S&S)
1 records classified as fatality
2,151 of 2,290 violations with amounts
378 inspections · 378 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 416 | 31 | 407,751.00 | 30 | 0 | 53 | 1,286.3 |
| 2025-Q2 | 350 | 26 | 270,857.00 | 21 | 0 | 48 | 1,086.5 |
| 2025-Q3 | 326 | 34 | 364,046.00 | 31 | 1 | 52 | 1,258.5 |
| 2025-Q4 | 267 | 16 | 208,605.00 | 24 | 0 | 36 | 922.5 |
| 2026-Q1 | 401 | 27 | 555,319.00 | 30 | 0 | 61 | 1,424.0 |
| 2026-Q2 | 201 | 19 | 313,891.00 | 32 | 0 | 46 | 1,100.5 |
| 2026-Q3 | 298 | 33 | 261,674.00 | 29 | 0 | 69 | 1,323.3 |
| 2026-Q4 * | 31 | 2 | — | 0 | 0 | 13 | 55.5 |
All violations issued in the selected period. Counts combine subsections.
57.4102 · $755.00 proposed
57.14100(b) · $313.00 proposed
57.14100(b) · $151.00 proposed
MACHINERY · DAYS RESTRICTED ACTIVITY ONLY
EE was repairing a defective windshield wiper unit. EE saw motor linkage was disconnected. While reconnecting the linkage, the wiper motor unexpectedly activated, pinching their left ring finger between the linkage and the ball. Seen at clinic, diagnosed with fractures to the left ring fingertip, and wound closed with sutures. Released to modified duty.
HANDTOOLS (NONPOWERED) · DAYS RESTRICTED ACTIVITY ONLY
EE using hammer to loosen a bull hose from cam fitting. Other EE assisting and pulling on bull hose. Bull hose released unexpectedly while the EE was swinging hammer, and their thumb was pinched between the two pound hammer and the cam fitting. At ER, thumb nail was removed and one suture placed in nail bed. Small fracture at tip of thumb. EE released to restricted duty.
DUST DISEASE OF LUNGS · OCCUPATNAL ILLNESS NOT DEG 1-6
EE has been off work since 3/28/25. On 4/9/26 they contacted NGM to notify us they were diagnosed with an occupational disease, bronchiolitis. EE was seen by a doctor who confirmed the diagnosis of bronchiolitis. They kept the EE off work pending ongoing treatment.
57.9313 · $151.00 proposed
57.3360 · $549.00 proposed
Regular Safety and Health Inspection · 45.5 on-site hours
57.3360 · $1,431.00 proposed
57.14100(d) · $226.00 proposed
57.4102 · $883.00 proposed
HANDLING OF MATERIALS · DYS AWY FRM WRK & RESTRCTD ACT
Ee had climbed up into EE's haul truck and sat down. EE dropped a paper, pulled the arm rest up to reach the paper, when EE felt a pop in the right side of EE's right shoulder, then instant pain. Seen at ER, diagnosed with a right proximal humerus fracture. EE has been diagnosed with osteopenia which can lead to non-traumatic fractures.
STRIKING OR BUMPING · DAYS AWAY FROM WORK ONLY
Ee was disconnecting a fire hose, walking while looking down, turned EE's head and ran into the outrigger of a crane with EE's face. Fractured EE's front teeth. Seen at Any Day Dental for treatment starting on 4/7 and went back in on 4/8 to complete. Released to full duty 4/9.
Verbal Hazard Complaint Inspections · 4.5 on-site hours
Compliance Follow-up Inspection · 2.0 on-site hours
57.3360 · $465.00 proposed
Verbal Hazard Complaint Inspections · 6.5 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 6.0 on-site hours
57.4200(b)(2) · $313.00 proposed
57.3200 · $818.00 proposed
57.4330(c) · $4,383.00 proposed
57.3360 · $465.00 proposed
57.3360 · $465.00 proposed
MACHINERY · DAYS AWAY FROM WORK ONLY
Ee reported to NGM on 5/4/26 that on 4/3/26 ee was working 'in EE's columns' when a contractor and crew started hydro blasting above EE, causing debris to fall onto EE. EE reports that EE and a coworker yelled and went to the control room. Injury not reported to NGM until 5/4/26. No signs of injury to ee. Site cannot confirm incident occurred as reported by ee.
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.