Coal production
0reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Atlas 874/115 Mine4105262 · Active6/8 quarters reported | Winkler, TXSurface · MSHA: Construction Sand and Gravel | 0 | 394,427 | 40 | 3 | 106.5 |
| Atlas Sand Kermit North Plant4105367 · Active6/8 quarters reported | Winkler, TXSurface · MSHA: Construction Sand and Gravel | 0 | 534,804 | 79 | 3 | 177.8 |
| Atlas Sand Kermit South Plant4105359 · Active6/8 quarters reported | Winkler, TXSurface · MSHA: Construction Sand and Gravel | 0 | 380,422 | 33 | 2 | 217.5 |
| OnCore 14105523 · Active6/8 quarters reported | Howard, TXSurface · MSHA: Construction Sand and Gravel | 0 | 79,279 | 10 | 2 | 24.3 |
| OnCore 2B4105760 · Active6/8 quarters reported | Dawson, TXSurface · MSHA: Sand, Industrial NEC | 0 | 83,556 | 7 | 0 | 41.0 |
| OnCore3B4105751 · Active6/8 quarters reported | Glasscock, TXSurface · MSHA: Sand, Common | 0 | 102,684 | 6 | 0 | 27.0 |
| OnCore 44105638 · Active6/8 quarters reported | Midland, TXSurface · MSHA: Construction Sand and Gravel | 0 | 82,894 | 7 | 1 | 51.8 |
| OnCore54105647 · Active6/8 quarters reported | Howard, TXSurface · MSHA: Construction Sand and Gravel | 0 | 83,713 | 18 | 0 | 39.3 |
| OnCore64105675 · Active6/8 quarters reported | Glasscock, TXSurface · MSHA: Construction Sand and Gravel | 0 | 83,800 | 10 | 1 | 22.3 |
| OnCore74105700 · Active6/8 quarters reported | Loving, TXSurface · MSHA: Construction Sand and Gravel | 0 | 77,647 | 6 | 1 | 43.3 |
| OnCore84105750 · Active6/8 quarters reported | Howard, TXSurface · MSHA: Sand, Common | 0 | 113,503 | 3 | 0 | 17.3 |
| OnCore 94105766 · Active6/8 quarters reported | Loving, TXSurface · MSHA: Sand, Common | 0 | 77,215 | 3 | 1 | 49.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
12 of 12 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 12 mines listed under this controller were checked; 12 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 285,689 | 0.00 | 526 | 12/12 mines reporting |
| 2025 Q2 | 0 | 376,623 | 0.00 | 645 | 12/12 mines reporting |
| 2025 Q3 | 0 | 336,347 | 0.00 | 611 | 12/12 mines reporting |
| 2025 Q4 | 0 | 362,082 | 0.00 | 628 | 12/12 mines reporting |
| 2026 Q1 | 0 | 324,781 | 0.00 | 588 | 12/12 mines reporting |
| 2026 Q2 | 0 | 408,422 | 0.00 | 639 | 12/12 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
28 significant & substantial (S&S)
0 records classified as fatality
214 of 222 violations with amounts
70 inspections · 70 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 38 | 1 | 18,823.00 | 5 | 0 | 10 | 150.3 |
| 2025-Q2 | 19 | 2 | 9,749.00 | 0 | 0 | 13 | 142.8 |
| 2025-Q3 | 15 | 1 | 4,121.00 | 1 | 0 | 7 | 52.5 |
| 2025-Q4 | 4 | 2 | 3,164.00 | 1 | 0 | 3 | 26.0 |
| 2026-Q1 | 58 | 10 | 23,465.00 | 4 | 0 | 16 | 212.5 |
| 2026-Q2 | 69 | 9 | 16,663.00 | 1 | 0 | 15 | 179.3 |
| 2026-Q3 | 11 | 1 | 4,339.00 | 2 | 0 | 3 | 46.0 |
| 2026-Q4 * | 8 | 2 | — | 0 | 0 | 3 | 8.0 |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 26.0 on-site hours
56.14100(b) · $432.00 proposed
56.14100(b) · $432.00 proposed
Description not reported · $151.00 proposed
SLIP OR FALL OF PERSON · NO DYS AWY FRM WRK,NO RSTR ACT
On February 3rd, 2025, at 4:30 AM, an employee pulled back a hose with excessive force, lost balance, and rolled their left ankle while trying to stabilize. A crunching and popping sound was heard. Unable to bear weight, the employee's foot was dangling. Work partners, the foreman, and safety were notified. The injury was classified as recordable on March 2nd, 2025.
MACHINERY · DAYS AWAY FROM WORK ONLY
Miner was using an impact wrench to remove the bolts from the tail bearing. When they removed the last bolt, the bearing jumped up, trapping a hand between the bearing and the take-up guard.
Regular Safety and Health Inspection · 5.0 on-site hours
56.14206(b) · $151.00 proposed
56.14207 · $151.00 proposed
56.12005 · $151.00 proposed
56.12025 · $151.00 proposed
56.12005 · $151.00 proposed
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
An employee was assisting in replacing slurry pump PU6. While hoisting the new pump into place with a telehandler and chain hoist, it became stuck. The employee attempted to reposition it by placing EE's right-hand underneath. When the bind released, the pump shifted, crushing EE's right ring finger between the pump and the skid.
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was utilizing a grinder to cut a bearing sleeve. This task was necessary to replace the bearing on the head pulley of the C1 belt. Midway through the task, the grinder unexpectedly kicked back towards the employee, causing the grinder's disk to make contact with the employee's left forearm resulting in a laceration.
56.23004(a) · $151.00 proposed
56.15005 · $1,219.00 proposed
56.12018 · $366.00 proposed
56.12008 · $366.00 proposed
56.12002 · $366.00 proposed
56.12034 · $366.00 proposed
56.11012 · $366.00 proposed
56.16010 · $366.00 proposed
56.12032 · $165.00 proposed
50.11(b) · $151.00 proposed
50.20-1 · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.