ACTIVE / CONTROLLER PORTFOLIO

Arne L Wirkkala

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDM04864

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Naselle Quarry4500063 · Active6/8 quarters reportedPacific, WASurface · MSHA: Crushed, Broken Traprock028,87823076.5

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

23

3 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q24
  3. 2025 Q30
  4. 2025 Q49
  5. 2026 Q10
  6. 2026 Q24
  7. 2026 Q32
  8. 2026 Q4 *4

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

16,673.00

19 of 23 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2604
  3. 2025 Q3—
  4. 2025 Q414,931
  5. 2026 Q1—
  6. 2026 Q2836
  7. 2026 Q3302
  8. 2026 Q4 *—

On-site inspection hours

76.50

10 inspections · 10 with hours

  1. 2025 Q1—
  2. 2025 Q26.50
  3. 2025 Q35.00
  4. 2025 Q428.25
  5. 2026 Q12.00
  6. 2026 Q219.25
  7. 2026 Q30.00
  8. 2026 Q4 *15.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q240604.000016.5
2025-Q300—0025.0
2025-Q49314,931.0000228.3
2026-Q100—0012.0
2026-Q240836.0000219.3
2026-Q320302.000010.0
2026-Q4 *40—00115.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF030CEB
    Naselle Quarry · 4500063

    103 (g) Written Notification Hazard Complaint Inspectio · 17.8 on-site hours

  2. inspectionF024363
    Naselle Quarry · 4500063

    Impoundment Spot Inspection · 3.0 on-site hours

  3. inspectionF024350
    Naselle Quarry · 4500063

    Impoundment Spot Inspection · 2.0 on-site hours

  4. inspectionF01B5C1
    Naselle Quarry · 4500063

    Regular Safety and Health Inspection · 6.5 on-site hours

  5. violation9308378
    Naselle Quarry · 4500063

    56.13015(a) · $151.00 proposed

  6. violation9308376
    Naselle Quarry · 4500063

    50.30(a) · $151.00 proposed

  7. violation9308375
    Naselle Quarry · 4500063

    56.4201(a)(2) · $151.00 proposed

  8. violation9308374
    Naselle Quarry · 4500063

    56.14132(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.