  1. Accumulation of combustible materials.

    violationRecord 5092693
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $165.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5020736
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5133209
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.503 · $549.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5133208
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.503 · $592.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5133207
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.512 · $288.00 proposed penalty

  6. Ventilation controls.

    violationRecord 5020303
    BLACK EAGLE · 4609550

    30 CFR 75.333(c)(1) · $267.00 proposed penalty

  7. Temporary notations, revisions, and supplements.

    violationRecord 5020302
    BLACK EAGLE · 4609550

    30 CFR 75.1202-1(b)(3) · $267.00 proposed penalty

  8. Ventilation controls.

    violationRecord 5020301
    BLACK EAGLE · 4609550

    30 CFR 75.333(b)(1) · $883.00 proposed penalty

  9. Roof control plan.

    violationRecord 5020300
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $4,749.00 proposed penalty

  10. Weekly examination.

    violationRecord 5020299
    BLACK EAGLE · 4609550

    30 CFR 75.364(b)(2) · $2,936.00 proposed penalty

  11. Maintenance of incombustible content of rock dust.

    violationRecord 5020298
    BLACK EAGLE · 4609550

    30 CFR 75.403 · $336.00 proposed penalty

  12. Maintenance of incombustible content of rock dust.

    violationRecord 5020297
    BLACK EAGLE · 4609550

    30 CFR 75.403 · $336.00 proposed penalty

  13. Other safeguards.

    violationRecord 5132130
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1403

  14. Machinery and equipment; operation and maintenance.

    violationRecord 5132129
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  15. Drill dust control at underground areas of underground mines.

    violationRecord 9882985
    DEEP MINE 41 · 4407223

    30 CFR 72.630(b) · $313.00 proposed penalty

  16. Permissible electric face equipment; maintenance.

    violationRecord 9272709
    DEEP MINE 44 · 4407308

    30 CFR 75.503 · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9272708
    DEEP MINE 44 · 4407308

    30 CFR 75.400 · $288.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5026206
    Kingston No. 2 · 4608932

    30 CFR 75.400 · $245.00 proposed penalty

  19. Permanent splicing of trailing cables.

    violationRecord 5026205
    Kingston No. 2 · 4608932

    30 CFR 75.604(b) · $209.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5092692
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  21. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5092691
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5092690
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1731(a) · $193.00 proposed penalty

  23. Other safeguards.

    violationRecord 5092689
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5020735
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5020734
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.