Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Short circuit protection; ratings and settings of circuit breakers.
Rolling Thunder Mine · 460911130 CFR 75.601-1 · $151.00 proposed penalty
Preshift examination at fixed intervals.
Rolling Thunder Mine · 460911130 CFR 75.360(g) · $151.00 proposed penalty
Violation — cited standard not reported
PANTHER EAGLE MINE · 4609212$215.00 proposed penalty
Map of electrical system.
ROAD FORK #52 MINE · 460952230 CFR 75.508 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
ROAD FORK #52 MINE · 460952230 CFR 75.512 · $398.00 proposed penalty
Methane monitors.
BLACK EAGLE · 460955030 CFR 75.342(a)(4) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Cedar Grove Mine No 3 · 460961130 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Dust disease of lungs
DEEP MINE 44 · 4407308Occupatnal illness not deg 1-6
Accident narrative
Received a CWP diagnosis for employee on 4/22/2026.
Hand-held power tools; safety devices.
88 Strip · 440716330 CFR 77.402 · $177.00 proposed penalty
Mobile equipment; automatic warning devices.
88 Strip · 440716330 CFR 77.410(c) · $177.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
88 Strip · 440716330 CFR 77.1606(c) · $336.00 proposed penalty
Maintenance of incombustible content of rock dust.
DEEP MINE 41 · 440722330 CFR 75.403 · $165.00 proposed penalty
Maintenance of incombustible content of rock dust.
DEEP MINE 41 · 440722330 CFR 75.403 · $165.00 proposed penalty
Mechanical equipment guards.
DEEP MINE 44 · 440730830 CFR 75.1722(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
PANTHER EAGLE MINE · 460921230 CFR 75.1107-9(a)(1) · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
PANTHER EAGLE MINE · 460921230 CFR 75.370(a)(1) · $432.00 proposed penalty
Permanent splicing of trailing cables.
ROAD FORK #52 MINE · 460952230 CFR 75.604(b) · $755.00 proposed penalty
Other safeguards.
ROAD FORK #52 MINE · 460952230 CFR 75.1403
Electric equipment; examination, testing and maintenance.
ROAD FORK #52 MINE · 460952230 CFR 75.512 · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $592.00 proposed penalty
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 6.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
Jerry Fork Eagle · 46087871.5 on-site hours reported
Non-Fatal Accident Investigation
KINGSTON SEWELL · 46096316.5 on-site hours reported
Escapeways; bituminous and lignite mines.
DEEP MINE 41 · 440722330 CFR 75.380(d)(7)(iii) · $165.00 proposed penalty
Permissible electric face equipment; maintenance.
Kingston No. 2 · 460893230 CFR 75.503 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.