Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Drill dust control at underground areas of underground mines.
ROAD FORK #52 MINE · 460952230 CFR 72.630(b) · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
BLACK EAGLE · 460955030 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
BLACK EAGLE · 460955030 CFR 75.403 · $151.00 proposed penalty
Ventilation controls.
BLACK EAGLE · 460955030 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty
Accumulation of combustible materials.
Davy Branch Mine · 460957430 CFR 75.400 · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
Davy Branch Mine · 460957430 CFR 75.370(a)(1) · $209.00 proposed penalty
Roof control plan.
Davy Branch Mine · 460957430 CFR 75.220(a)(1) · $209.00 proposed penalty
Installation of water sprinkler systems; requirements.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1101-7(b) · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.512 · $226.00 proposed penalty
Accumulation of combustible materials.
Cedar Grove Mine No 3 · 460961130 CFR 75.400 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Cedar Grove Mine No 3 · 460961130 CFR 75.370(a)(1) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Cedar Grove Mine No 3 · 460961130 CFR 75.370(a)(1) · $209.00 proposed penalty
Fall of face/rib/pillar/side/highwall
ROAD FORK #52 MINE · 4609522Days away from work only
Accident narrative
Employee stated, EE was walking by the corner in number nine entry, when the corner fell out striking EE on the left side of EE's upper back.
Impoundment Spot Inspection
Marfork Processing · 46083744.3 on-site hours reported
Spot Inspections
ROAD FORK #52 MINE · 4609522103(i) · 5.5 on-site hours reported
Preshift examination at fixed intervals.
DEEP MINE 41 · 440722330 CFR 75.360(f) · $151.00 proposed penalty
Preshift examination at fixed intervals.
DEEP MINE 44 · 440730830 CFR 75.360(g) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Kingston No. 2 · 460893230 CFR 75.370(a)(1) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Kingston No. 2 · 460893230 CFR 75.503 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Rolling Thunder Mine · 460911130 CFR 75.503 · $288.00 proposed penalty
Permanent splicing of trailing cables.
Rolling Thunder Mine · 460911130 CFR 75.604(b) · $366.00 proposed penalty
Preshift examination at fixed intervals.
Rolling Thunder Mine · 460911130 CFR 75.360(g) · $151.00 proposed penalty
Immediate notification.
PANTHER EAGLE MINE · 460921230 CFR 50.10(b) · $7,555.00 proposed penalty
Roof control plan.
PANTHER EAGLE MINE · 460921230 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
PANTHER EAGLE MINE · 460921230 CFR 75.512 · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.