Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 4.0 on-site hours reported
Spot Inspection
Allen Powellton Mine · 46090922.5 on-site hours reported
Mine ventilation plan; submission and approval.
DEEP MINE 41 · 440722330 CFR 75.370(a)(1) · $245.00 proposed penalty
Machinery and equipment; operation and maintenance.
Jerry Fork Eagle · 460878730 CFR 75.1725(a) · $336.00 proposed penalty
Handtools (nonpowered)
Ewing Fork No. 1 Surface Mine · 4609026Days away from work only
Accident narrative
Employee was installing a new tire on the water truck, EE was using a hammer to align the tire when the locking ring failed causing a sudden release of energy striking the employee. This resulted in a fracture of the left forearm and front teeth.
Mine Idle Activity
Hernshaw Mine · 46088023.5 on-site hours reported
Additional self-contained self-rescuers (SCSRs).
Jerry Fork Eagle · 460878730 CFR 75.1714-4(b) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
Jerry Fork Eagle · 460878730 CFR 75.1725(a) · $336.00 proposed penalty
Machinery and equipment; operation and maintenance.
Jerry Fork Eagle · 460878730 CFR 75.1725(a) · $336.00 proposed penalty
Automatic emergency-parking brakes.
Jerry Fork Eagle · 460878730 CFR 75.523-3(b)(5) · $193.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Jerry Fork Eagle · 460878730 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · $549.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $504.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
ROAD FORK #52 MINE · 460952230 CFR 75.1731(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
ROAD FORK #52 MINE · 460952230 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 7.5 on-site hours reported
Spot Inspections
ROAD FORK #52 MINE · 4609522103(i) · 6.0 on-site hours reported
Storage of materials.
TOMS CREEK COMPLEX · 440527030 CFR 77.208(d) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
PANTHER EAGLE MINE · 460921230 CFR 70.208(a)(2) · $288.00 proposed penalty
Cited standard: 30 CFR 70.207(a)
PANTHER EAGLE MINE · 460921230 CFR 70.207(a) · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
PANTHER EAGLE MINE · 460921230 CFR 75.403 · $432.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $165.00 proposed penalty
Methane monitors.
ROAD FORK #52 MINE · 460952230 CFR 75.342(a)(4) · $313.00 proposed penalty
Preshift examination at fixed intervals.
Cedar Grove Mine No 3 · 460961130 CFR 75.360(a)(1) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
Cedar Grove Mine No 3 · 460961130 CFR 75.202(a) · Significant and substantial (S&S)
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.