Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
BLACK EAGLE · 460955030 CFR 75.400 · $226.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Davy Branch Mine · 460957430 CFR 75.512 · $193.00 proposed penalty
Other safeguards.
Davy Branch Mine · 460957430 CFR 75.1403 · $267.00 proposed penalty
Roof control plan.
Lynn Branch No. 2 Mine · 460957530 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Protection from falls of roof, face and ribs.
Lynn Branch No. 2 Mine · 460957530 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
Lynn Branch No. 2 Mine · 460957530 CFR 75.701 · $592.00 proposed penalty
Identification of circuit breakers.
Lynn Branch No. 2 Mine · 460957530 CFR 75.904 · $592.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1101-8(a) · $398.00 proposed penalty
Installation of water sprinkler systems; requirements.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1101-7(c) · $398.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 6.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
Republic Energy · 460905430 CFR 77.1606(c) · $432.00 proposed penalty
Mobile equipment; automatic warning devices.
Republic Energy · 460905430 CFR 77.410(a)(1) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Republic Energy · 460905430 CFR 77.1606(c) · $432.00 proposed penalty
Permanent splicing of trailing cables.
ROAD FORK #52 MINE · 460952230 CFR 75.604(b) · $755.00 proposed penalty
Handling of materials
PANTHER EAGLE MINE · 4609212No dys awy frm wrk,no rstr act
Accident narrative
Employee stated EE went to walk through a set of fly pads and one of them caught EE knocking EE's hard hat off and EE's glasses. Resulting in a fly pad scratching EE's eye.
Handtools (nonpowered)
PANTHER EAGLE MINE · 4609212No dys awy frm wrk,no rstr act
Accident narrative
Miner was assisting in making a belt splice using a nail board and quick loads, miner attempted to move the quick load plunger when the other miner swung the hammer striking injured in the back of the hand just below the index finger. Resulted in a fracture.
103 (g) Written Notification Hazard Complaint Inspectio
Rum Creek Preparation Plant · 46050869.8 on-site hours reported
Impoundment Spot Inspection
Power Mountain Processing · 46068804.0 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 6.0 on-site hours reported
Regular Safety and Health Inspection
KINGSTON SEWELL · 460963142.8 on-site hours reported
Mine ventilation plan; submission and approval.
DEEP MINE 41 · 440722330 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
DEEP MINE 41 · 440722330 CFR 75.512 · $549.00 proposed penalty
Travelways at surface installations.
Rum Creek Preparation Plant · 460508630 CFR 77.205(d) · $151.00 proposed penalty
Mechanical equipment guards.
Rum Creek Preparation Plant · 460508630 CFR 77.400(d) · $151.00 proposed penalty
Travelways at surface installations.
Rum Creek Preparation Plant · 460508630 CFR 77.205(d) · Significant and substantial (S&S) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.