Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electric equipment; examination, testing, and maintenance.
Kepler No. 1 Prep Plant · 460463730 CFR 77.502 · $151.00 proposed penalty
Travelways at surface installations.
Kepler No. 1 Prep Plant · 460463730 CFR 77.205(b) · $151.00 proposed penalty
Mechanical equipment guards.
Kepler No. 1 Prep Plant · 460463730 CFR 77.400(a) · $151.00 proposed penalty
Daily inspection of surface coal mine; certified person; reports of inspection.
Kepler No. 1 Prep Plant · 460463730 CFR 77.1713(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Kingston No. 2 · 460893230 CFR 75.370(a)(1) · $177.00 proposed penalty
Electric equipment; examination, testing and maintenance.
PANTHER EAGLE MINE · 460921230 CFR 75.512 · $209.00 proposed penalty
Mechanical equipment guards.
PANTHER EAGLE MINE · 460921230 CFR 75.1722(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $398.00 proposed penalty
Automatic emergency-parking brakes.
PANTHER EAGLE MINE · 460921230 CFR 75.523-3(c)(2) · $288.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
ROAD FORK #52 MINE · 460952230 CFR 75.380(d)(1) · $1,968.00 proposed penalty
Accumulation of combustible materials.
ROAD FORK #52 MINE · 460952230 CFR 75.400 · $642.00 proposed penalty
Canopies or cabs; self-propelled diesel-powered and electric face equipment; installation requirements.
ROAD FORK #52 MINE · 460952230 CFR 75.1710-1(e) · $151.00 proposed penalty
Accumulation of combustible materials.
ROAD FORK #52 MINE · 460952230 CFR 75.400 · $642.00 proposed penalty
Mechanical equipment guards.
ROAD FORK #52 MINE · 460952230 CFR 75.1722(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Machinery and equipment; operation and maintenance.
ROAD FORK #52 MINE · 460952230 CFR 75.1725(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Mechanical equipment guards.
ROAD FORK #52 MINE · 460952230 CFR 75.1722(c) · $504.00 proposed penalty
Accumulation of combustible materials.
ROAD FORK #52 MINE · 460952230 CFR 75.400 · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
BLACK EAGLE · 460955030 CFR 75.503 · $177.00 proposed penalty
Permanent splicing of trailing cables.
BLACK EAGLE · 460955030 CFR 75.604(b) · $697.00 proposed penalty
Accumulation of combustible materials.
BLACK EAGLE · 460955030 CFR 75.400 · $288.00 proposed penalty
Regular Safety and Health Inspection
TOMS CREEK COMPLEX · 4405270133.5 on-site hours reported
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 5.0 on-site hours reported
Spot Inspections
BLACK EAGLE · 4609550103(i) · 4.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.