Alliance Resource Partners LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of belt conveyors and belt conveyor entries.
RIVER VIEW MINE · 151937430 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
RIVER VIEW MINE · 151937430 CFR 75.1731(a) · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
RIVER VIEW MINE · 151937430 CFR 75.1731(b) · $151.00 proposed penalty
Criteria—Haulage; general.
RIVER VIEW MINE · 151937430 CFR 75.1403-10(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
RIVER VIEW MINE · 151937430 CFR 75.1731(a) · $151.00 proposed penalty
Belt air course ventilation.
RIVER VIEW MINE · 151937430 CFR 75.350(a)(2) · $151.00 proposed penalty
Roof bolting.
RIVER VIEW MINE · 151937430 CFR 75.204(c)(1) · $245.00 proposed penalty
Accumulation of combustible materials.
RIVER VIEW MINE · 151937430 CFR 75.400 · $398.00 proposed penalty
Quantity and location of firefighting equipment.
Excel #5 · 151983830 CFR 75.1100-2(a)(1) · $209.00 proposed penalty
Quarterly sampling; mechanized mining units.
Excel #5 · 151983830 CFR 70.208(a)(2) · $336.00 proposed penalty
Quarterly sampling; mechanized mining units.
Excel #5 · 151983830 CFR 70.208(a)(2) · $336.00 proposed penalty
Quarterly sampling; mechanized mining units.
Excel #5 · 151983830 CFR 70.208(a)(2) · $336.00 proposed penalty
Mine ventilation plan; submission and approval.
TUNNEL RIDGE MINE · 460886430 CFR 75.370(a)(1) · $151.00 proposed penalty
Handtools (nonpowered)
CARDINAL · 1517216No dys awy frm wrk,no rstr act
Accident narrative
Employee was trimming belt with a knife when the knife slipped contacting the employees right forearm resulting in 5 sutures.
Shaft, Slope or Major Construction Spot Inspection
MINE NO. 1 · 11032032.5 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 7.5 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(b) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
RIVER VIEW MINE · 151937430 CFR 75.1600-2(e) · $245.00 proposed penalty
Accumulation of combustible materials.
RIVER VIEW MINE · 151937430 CFR 75.400 · $177.00 proposed penalty
On-shift examination.
Excel #5 · 151983830 CFR 75.362(g)(2)(i) · $209.00 proposed penalty
Mine ventilation plan; submission and approval.
TUNNEL RIDGE MINE · 460886430 CFR 75.370(a)(1) · $165.00 proposed penalty
Machinery and equipment; operation and maintenance.
TUNNEL RIDGE MINE · 460886430 CFR 75.1725(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Approved conveyor belts.
TUNNEL RIDGE MINE · 460886430 CFR 75.1108(b) · $151.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 5.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.