Alliance Resource Partners LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Maintenance of incombustible content of rock dust.
Henderson County Mine · 150270930 CFR 75.403 · $151.00 proposed penalty
Preshift examination at fixed intervals.
CARDINAL · 151721630 CFR 75.360(a)(1) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a)
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(b)
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(a)
Accumulation of combustible materials.
CARDINAL · 151721630 CFR 75.400 · Significant and substantial (S&S)
Nonpermissible diesel-powered equipment; design and performance requirements.
Excel #5 · 151983830 CFR 75.1909(c)(5) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
Excel #5 · 151983830 CFR 75.1909(a)(2) · $151.00 proposed penalty
Slip or fall of person
CARDINAL · 1517216Days away from work only
Accident narrative
Employee was stepping down from a 30" bank at the 6B header resulting in a strained back. EE is being treated for sciatica.
Spot Inspections
Gibson South · 1202388103(i) · 6.3 on-site hours reported
Spot Inspections
CARDINAL · 1517216103(i) · 14.8 on-site hours reported
Non-Injury Accident Investigation
RIVER VIEW MINE · 151937418.0 on-site hours reported
Machinery and equipment; operation and maintenance.
MINE NO. 1 · 110320330 CFR 77.404(a) · Significant and substantial (S&S)
Power wires and cables; insulation and protection.
Henderson County Mine · 150270930 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · Significant and substantial (S&S) · $883.00 proposed penalty
Violation — cited standard not reported
RIVER VIEW MINE · 1519374Roof control plan.
RIVER VIEW MINE · 151937430 CFR 75.220(a)(1) · $151.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
RIVER VIEW MINE · 151937430 CFR 75.363(b) · $177.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Mountain View Mine · 460902830 CFR 75.1731(b) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Mountain View Mine · 460902830 CFR 75.517 · $267.00 proposed penalty
Fall of roof or back
RIVER VIEW MINE · 1519374Accident only
Accident narrative
A roof fall has occurred on the #1 unit of the 1I panel in #4 entry. From spad 20+20 to 20+85. The fall measured 25ft x 6ft x 19ft. The fall will not be loaded out and the area has had additional support added.
Verbal Hazard Complaint Inspections
MINE NO. 1 · 11032035.0 on-site hours reported
Spot Inspections
Excel #5 · 1519838103(i) · 2.0 on-site hours reported
Spot Inspections
TUNNEL RIDGE MINE · 4608864103(i) · 6.0 on-site hours reported
Condition and examination of firefighting equipment.
MINE NO. 1 · 110320330 CFR 75.1100-3 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.