Alliance Resource Partners LP safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
RIVER VIEW MINE · 151937430 CFR 75.400 · $642.00 proposed penalty
Electric equipment; examination, testing and maintenance.
RIVER VIEW MINE · 151937430 CFR 75.512 · $151.00 proposed penalty
Cable fittings; suitability.
RIVER VIEW MINE · 151937430 CFR 75.515 · $193.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
RIVER VIEW MINE · 151937430 CFR 75.1714-3(d) · $193.00 proposed penalty
Cable fittings; suitability.
RIVER VIEW MINE · 151937430 CFR 75.515 · $193.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
Excel #5 · 151983830 CFR 75.1107-7(b) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Excel #5 · 151983830 CFR 75.503 · $226.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
Excel #5 · 151983830 CFR 75.1107-7(b) · $209.00 proposed penalty
Permissible electric face equipment; maintenance.
Excel #5 · 151983830 CFR 75.503 · $1,679.00 proposed penalty
Spot Inspections
Excel #5 · 1519838103(i) · 8.0 on-site hours reported
Flammable liquids; storage.
Henderson County Mine · 150270930 CFR 77.1103(d) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Quantity and location of firefighting equipment.
CARDINAL · 151721630 CFR 75.1100-2(f) · $245.00 proposed penalty
Condition and examination of firefighting equipment.
CARDINAL · 151721630 CFR 75.1100-3 · $245.00 proposed penalty
Emergency tethers.
RIVER VIEW MINE · 151937430 CFR 75.1714-6 · $151.00 proposed penalty
Frequency of examinations.
RIVER VIEW MINE · 151937430 CFR 75.512-2 · $642.00 proposed penalty
Machinery and equipment; operation and maintenance.
RIVER VIEW MINE · 151937430 CFR 75.1725(a) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
RIVER VIEW MINE · 151937430 CFR 75.512 · $755.00 proposed penalty
Escapeways; bituminous and lignite mines.
Excel #5 · 151983830 CFR 75.380(d)(7)(iii) · $1,219.00 proposed penalty
Violation — cited standard not reported
Excel #5 · 1519838$273.00 proposed penalty
Permissible electric face equipment; maintenance.
Mountain View Mine · 460902830 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
Mountain View Mine · 460902830 CFR 75.400 · $193.00 proposed penalty
Escapeways; bituminous and lignite mines.
Mountain View Mine · 460902830 CFR 75.380(d)(4)(ii) · $336.00 proposed penalty
Handling of materials
Gibson South · 1202388Days away from work only
Accident narrative
Employee was moving miner cable over in order to hang when EE felt a sharp pain in EE's lower abdomen. EE was later seen by a doctor and diagnosed with a hernia. EE underwent surgery on 8/11/2025 and is expected to make a full recovery.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.