Coal production
44,885,365reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Conner Run Dam and Fly Ash Impoundment4609072 · Active6/8 quarters reported | Marshall, WVFacility · MSHA: Coal (Bituminous) | 0 | 4,339 | 4 | 1 | 84.5 |
| Harrison County Mine4601318 · Active6/8 quarters reported | Wetzel, WVUnderground · MSHA: Coal (Bituminous) | 8,378,627 | 1,641,378 | 530 | 75 | 4,528.5 |
| Marion County Mine4601433 · Active6/8 quarters reported | Marion, WVUnderground · MSHA: Coal (Bituminous) | 10,664,512 | 1,926,403 | 968 | 148 | 6,615.8 |
| MARSHALL COUNTY MINE4601437 · Active6/8 quarters reported | Marshall, WVUnderground · MSHA: Coal (Bituminous) | 16,866,424 | 3,440,333 | 1,616 | 341 | 8,033.0 |
| Marshall County River Loadout4601438 · Active6/8 quarters reported | Marshall, WVFacility · MSHA: Coal (Bituminous) | 0 | 69,589 | 2 | 1 | 33.5 |
| OHIO COUNTY MINE4601436 · Active6/8 quarters reported | Marshall, WVUnderground · MSHA: Coal (Bituminous) | 8,975,802 | 1,739,392 | 549 | 95 | 5,047.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 6 mines listed under this controller were checked; 6 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 7,645,087 | 1,377,008 | 5.55 | 2,223 | 6/6 mines reporting |
| 2025 Q2 | 7,288,921 | 1,418,719 | 5.14 | 2,292 | 6/6 mines reporting |
| 2025 Q3 | 6,928,623 | 1,453,487 | 4.77 | 2,270 | 6/6 mines reporting |
| 2025 Q4 | 7,876,985 | 1,401,230 | 5.62 | 2,272 | 6/6 mines reporting |
| 2026 Q1 | 6,851,742 | 1,384,848 | 4.95 | 2,237 | 6/6 mines reporting |
| 2026 Q2 | 8,294,007 | 1,786,142 | 4.64 | 2,325 | 6/6 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
551 significant & substantial (S&S)
1 records classified as fatality
3,327 of 3,669 violations with amounts
1,009 inspections · 1,009 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 445 | 55 | 252,258.00 | 83 | 0 | 137 | 3,279.3 |
| 2025-Q2 | 431 | 56 | 242,509.00 | 81 | 0 | 136 | 3,510.3 |
| 2025-Q3 | 594 | 104 | 455,343.00 | 115 | 0 | 167 | 3,790.3 |
| 2025-Q4 | 393 | 46 | 222,274.00 | 81 | 0 | 121 | 3,144.3 |
| 2026-Q1 | 345 | 44 | 285,799.00 | 80 | 0 | 123 | 3,100.0 |
| 2026-Q2 | 591 | 90 | 556,887.00 | 97 | 1 | 125 | 3,380.8 |
| 2026-Q3 | 786 | 144 | 421,064.00 | 124 | 0 | 172 | 3,775.5 |
| 2026-Q4 * | 84 | 12 | — | 0 | 0 | 28 | 362.8 |
All violations issued in the selected period. Counts combine subsections.
75.400 · $288.00 proposed
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
This injury was not identified as as a recordable until 01/09/26. The EE reported a back strain while lifting and moving a vulcanizing press from a belt line UG to a track on a flat car on a mine site. At a later time the EE received treatment at a medical facility and an over counter prescription resulting in a recordable incident due to the original injury.
103(i) Spot Inspections · 6.0 on-site hours
103(i) Spot Inspections · 10.0 on-site hours
Health Technical Investigation · 6.0 on-site hours
103(i) Spot Inspections · 4.0 on-site hours
75.333(c) · $151.00 proposed
103(i) Spot Inspections · 5.3 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 5.0 on-site hours
77.1605(k) · $245.00 proposed
75.1103-1 · $151.00 proposed
75.321(a)(1) · $151.00 proposed
75.400 · $366.00 proposed
75.333(h) · $177.00 proposed
75.1403-8(d) · $151.00 proposed
75.370(a)(1) · $697.00 proposed
75.380(d)(5) · $313.00 proposed
75.204(f)(7) · $313.00 proposed
75.400 · $366.00 proposed
75.1403 · $226.00 proposed
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Injured was hanging a run through curtain up in #2 entry of St Leo Mains 131-132 block, standing on the third rung of a 4' ladder leaning off the ladder to install a nail through the curtain when EE fell off the ladder and bruised EE's back when landing on the mine floor. No problems with equipment or compliance issues, training or PPE.
103(i) Spot Inspections · 7.8 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 3.0 on-site hours
103(i) Spot Inspections · 5.0 on-site hours
Electrical Technical Investigation · 0.0 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA source checks are overdue. Refresh receipts before serving this report.
Annual coal-price source checks are overdue. Refresh before serving estimates.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.