ACNR Holdings, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ventilation controls.
Marion County Mine · 460143330 CFR 75.333(h) · $288.00 proposed penalty
Atmospheric monitoring systems.
OHIO COUNTY MINE · 460143630 CFR 75.351(h) · $245.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $504.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was helping hang miner cable and water line into a roller hanger when they felt pop in their upper arm (bicep). PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
Harrison County Mine · 4601318103(i) · 9.0 on-site hours reported
Spot Inspections
Marion County Mine · 4601433103(i) · 10.0 on-site hours reported
Spot Inspections
OHIO COUNTY MINE · 4601436103(i) · 7.0 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 8.5 on-site hours reported
Permanent splicing of trailing cables.
Harrison County Mine · 460131830 CFR 75.604(b) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
Marion County Mine · 460143330 CFR 75.517 · $151.00 proposed penalty
Ventilation controls.
Marion County Mine · 460143330 CFR 75.333(h) · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
OHIO COUNTY MINE · 460143630 CFR 75.370(a)(1) · $592.00 proposed penalty
Permissible electric face equipment; maintenance.
OHIO COUNTY MINE · 460143630 CFR 75.503 · $267.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $432.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(3) · $313.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $465.00 proposed penalty
Preshift examination at fixed intervals.
MARSHALL COUNTY MINE · 460143730 CFR 75.360(b)(11)(i) · $313.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Installation of high-voltage transmission cables.
MARSHALL COUNTY MINE · 460143730 CFR 75.807 · $465.00 proposed penalty
Roof control plan.
MARSHALL COUNTY MINE · 460143730 CFR 75.220(a)(1) · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
MARSHALL COUNTY MINE · 460143730 CFR 75.380(d)(1) · Significant and substantial (S&S) · $9,004.00 proposed penalty
Escapeways; bituminous and lignite mines.
MARSHALL COUNTY MINE · 460143730 CFR 75.380(d)(7)(vi) · $465.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $165.00 proposed penalty
Handtools (nonpowered)
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was working on a cable repair when knife slipped and cut their finger, causing them to receive stitches. PPE was a factor, mining systems was a factor, compliance with rules and regulations was not a factor.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.