Electrical conductors.
WINGDALE MINE · 300313830 CFR 57.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313824.8 on-site hours reported
Moving machine parts.
WINGDALE MINE · 300313830 CFR 57.14107(a) · $151.00 proposed penalty
Machinery, equipment, and tools.
WINGDALE MINE · 300313830 CFR 57.14205 · Significant and substantial (S&S) · $165.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313834.8 on-site hours reported
Temporary, portable containers.
WINGDALE MINE · 300313830 CFR 47.44(b) · $151.00 proposed penalty
Protection for openings around travelways.
WINGDALE MINE · 300313830 CFR 57.11012 · Significant and substantial (S&S) · $313.00 proposed penalty
Safety defects; examination, correction and records.
WINGDALE MINE · 300313830 CFR 57.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
WINGDALE MINE · 300313830 CFR 57.14100(c) · $151.00 proposed penalty
Horns and backup alarms for surface equipment.
WINGDALE MINE · 300313830 CFR 57.14132(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313820.8 on-site hours reported
Compliance Follow-up Inspection
WINGDALE MINE · 30031380.8 on-site hours reported
Safety defects; examination, correction and records.
WINGDALE MINE · 300313830 CFR 57.14100(c) · $151.00 proposed penalty
Underground alarm systems.
WINGDALE MINE · 300313830 CFR 57.4360(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313831.3 on-site hours reported
Moving machine parts.
WINGDALE MINE · 300313830 CFR 57.14107(a) · $151.00 proposed penalty
Moving machine parts.
WINGDALE MINE · 300313830 CFR 57.14107(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313824.3 on-site hours reported
Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.
WINGDALE MINE · 300313830 CFR 48.3(c)(2) · $151.00 proposed penalty
Ventilation plan.
WINGDALE MINE · 300313830 CFR 57.8520(b)(9) · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313851.0 on-site hours reported
Compliance Follow-up Inspection
WINGDALE MINE · 30031381.5 on-site hours reported
Correction of dangerous conditions.
WINGDALE MINE · 300313830 CFR 56.12030 · $151.00 proposed penalty
Correction of hazardous conditions.
WINGDALE MINE · 300313830 CFR 56.3200 · $151.00 proposed penalty
Regular Safety and Health Inspection
WINGDALE MINE · 300313824.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.