Western Proppants, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Electrical conductors.
Western Proppants Facility #1 · 480183330 CFR 56.12004 · $465.00 proposed penalty
Moving machine parts.
Western Proppants Facility #1 · 480183330 CFR 56.14107(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty
Protection for openings around travelways.
Western Proppants Facility #1 · 480183330 CFR 56.11012 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Restricted clearance.
Western Proppants Facility #1 · 480183330 CFR 56.11008 · Significant and substantial (S&S) · $697.00 proposed penalty
Exposure monitoring.
Western Proppants Facility #1 · 480183330 CFR 56.5002 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Flying or falling materials.
Western Proppants Facility #1 · 480183330 CFR 56.14110 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Construction and maintenance of guards.
Western Proppants Facility #1 · 480183330 CFR 56.14112(a)(1) · $465.00 proposed penalty
Records of training.
Western Proppants Facility #1 · 480183330 CFR 46.9(h) · $151.00 proposed penalty
Spot Inspection
Western Proppants Facility #1 · 48018337.0 on-site hours reported
Construction and maintenance of ladders.
Western Proppants Facility #1 · 480183330 CFR 56.11003 · Significant and substantial (S&S) · $5,716.00 proposed penalty
HazCom program contents.
Western Proppants Facility #1 · 480183330 CFR 47.32(b) · $151.00 proposed penalty
Records of training.
Western Proppants Facility #1 · 480183330 CFR 46.9(b)(5) · $151.00 proposed penalty
Requirements for written safety program.
Western Proppants Facility #1 · 480183330 CFR 56.23003(b) · $151.00 proposed penalty
Testing grounding systems.
Western Proppants Facility #1 · 480183330 CFR 56.12028 · $1,037.00 proposed penalty
Electrical conductors.
Western Proppants Facility #1 · 480183330 CFR 56.12004 · $1,037.00 proposed penalty
Construction and maintenance of guards.
Western Proppants Facility #1 · 480183330 CFR 56.14112(b) · $3,832.00 proposed penalty
Electrical conductors.
Western Proppants Facility #1 · 480183330 CFR 56.12004 · $1,037.00 proposed penalty
Protection for openings around travelways.
Western Proppants Facility #1 · 480183330 CFR 56.11012 · $313.00 proposed penalty
Construction and maintenance of ladders.
Western Proppants Facility #1 · 480183330 CFR 56.11003 · $151.00 proposed penalty
Housekeeping.
Western Proppants Facility #1 · 480183330 CFR 56.20003(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty
Construction and maintenance of guards.
Western Proppants Facility #1 · 480183330 CFR 56.14112(b) · $3,832.00 proposed penalty
Handrails and toeboards.
Western Proppants Facility #1 · 480183330 CFR 56.11002 · Significant and substantial (S&S) · $17,082.00 proposed penalty
Safe access.
Western Proppants Facility #1 · 480183330 CFR 56.11001 · $313.00 proposed penalty
Construction and maintenance of guards.
Western Proppants Facility #1 · 480183330 CFR 56.14112(b) · $1,550.00 proposed penalty
Verbal Hazard Complaint Inspections
Western Proppants Facility #1 · 480183311.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.