← Warrior Met Coal Mining, LLC

Warrior Met Coal Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Communications facilities; refuge alternatives.

    violationRecord 9827130
    No 7 Mine · 0101401

    30 CFR 75.1600-3(a)(2) · $398.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 9827129
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 9827128
    No 7 Mine · 0101401

    30 CFR 75.1722(a) · $226.00 proposed penalty

  4. Escapeway maps.

    violationRecord 9827127
    No 7 Mine · 0101401

    30 CFR 75.1505(b) · $336.00 proposed penalty

  5. Methane monitors.

    violationRecord 9827126
    No 7 Mine · 0101401

    30 CFR 75.342(a)(4) · $226.00 proposed penalty

  6. Preshift examination at fixed intervals.

    violationRecord 5061820
    No 7 Mine · 0101401

    30 CFR 75.360(g) · $151.00 proposed penalty

  7. Maintenance of diesel-powered equipment.

    violationRecord 5062456
    No 4 Mine · 0101247

    30 CFR 75.1914(a) · $288.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9827125
    No 7 Mine · 0101401

    30 CFR 75.400 · $465.00 proposed penalty

  9. Roof control plan.

    violationRecord 9827124
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9827123
    No 7 Mine · 0101401

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 9827122
    No 7 Mine · 0101401

    30 CFR 75.380(d)(7)(vi) · $336.00 proposed penalty

  12. Accumulations of combustible materials.

    violationRecord 9631791
    No 7 Mine · 0101401

    30 CFR 77.1104 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F014C04
    No 4 Mine · 0101247

    103(i) · 6.8 on-site hours reported

  14. Spot Inspections

    inspectionRecord F02E10A
    No 7 Mine · 0101401

    103(i) · 9.3 on-site hours reported

  15. Protection from falls of roof, face and ribs.

    violationRecord 5063005
    No 7 Mine · 0101401

    30 CFR 75.202(a) · $398.00 proposed penalty

  16. Roof control plan.

    violationRecord 5062455
    No 4 Mine · 0101247

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 5062454
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  18. Roof control plan.

    violationRecord 5062453
    No 4 Mine · 0101247

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  19. Temporary notations, revisions, and supplements.

    violationRecord 9825909
    No 4 Mine · 0101247

    30 CFR 75.1202 · $151.00 proposed penalty

  20. Escapeways; bituminous and lignite mines.

    violationRecord 9825908
    No 4 Mine · 0101247

    30 CFR 75.380(d)(7)(vi) · $313.00 proposed penalty

  21. Roof control plan.

    violationRecord 9827121
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  22. Ventilation controls.

    violationRecord 9827120
    No 7 Mine · 0101401

    30 CFR 75.333(c)(3) · $226.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5062452
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 9825907
    No 4 Mine · 0101247

    30 CFR 75.202(a) · $592.00 proposed penalty

  25. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5062451
    No 4 Mine · 0101247

    30 CFR 75.1911(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.