Warrior Met Coal Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(b) · $226.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(b) · $226.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(c) · $336.00 proposed penalty
Weekly examination.
No 7 Mine · 010140130 CFR 75.364(h) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
No 7 Mine · 010140130 CFR 75.202(a) · $398.00 proposed penalty
Construction and repair of seals.
No 7 Mine · 010140130 CFR 75.337(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Spot Inspections
No 4 Mine · 0101247103(i) · 8.5 on-site hours reported
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $288.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(c) · $336.00 proposed penalty
Methane monitors.
No 7 Mine · 010140130 CFR 75.342(a)(4) · Significant and substantial (S&S) · $549.00 proposed penalty
Methane monitors.
No 7 Mine · 010140130 CFR 75.342(a)(4) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · Significant and substantial (S&S) · $7,084.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Spot Inspections
No 7 Mine · 0101401103(i) · 7.0 on-site hours reported
Temporary notations, revisions, and supplements.
No 7 Mine · 010140130 CFR 75.1202-1(b)(3) · $366.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(c) · $465.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(c)(3) · $151.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(e) · Significant and substantial (S&S) · $226.00 proposed penalty
Storage of materials.
No 7 Mine · 010140130 CFR 77.208(e) · $151.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $3,184.00 proposed penalty
Loading and haulage equipment; operation.
No 7 Mine · 010140130 CFR 77.1607(bb) · $755.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $288.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.