← Warrior Met Coal Mining, LLC

Warrior Met Coal Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 9752219
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F02F31A
    No 7 Mine · 0101401

    103(i) · 7.8 on-site hours reported

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5190941
    No 4 Mine · 0101247

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5062791
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  5. Weekly examination.

    violationRecord 5192670
    No 4 Mine · 0101247

    30 CFR 75.364(b)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  6. Mechanical equipment guards.

    violationRecord 5192026
    No 4 Mine · 0101247

    30 CFR 77.400(d) · $366.00 proposed penalty

  7. Other safeguards.

    violationRecord 5190669
    No 4 Mine · 0101247

    30 CFR 75.1403 · $267.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5191275
    No 7 Mine · 0101401

    30 CFR 75.400 · $465.00 proposed penalty

  9. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5191274
    No 7 Mine · 0101401

    30 CFR 75.1909(a)(7) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5191273
    No 7 Mine · 0101401

    30 CFR 75.400 · $465.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5191272
    No 7 Mine · 0101401

    30 CFR 75.400 · $465.00 proposed penalty

  12. Maintenance of diesel-powered equipment.

    violationRecord 5191271
    No 7 Mine · 0101401

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5192669
    No 4 Mine · 0101247

    30 CFR 75.202(a) · $504.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5192668
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  15. Communications facilities; refuge alternatives.

    violationRecord 5192217
    No 7 Mine · 0101401

    30 CFR 75.1600-3(a) · $959.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5191270
    No 7 Mine · 0101401

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5191269
    No 7 Mine · 0101401

    30 CFR 75.400 · $465.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F026FA8
    No 7 Mine · 0101401

    103(i) · 6.5 on-site hours reported

  19. Protection from falls of roof, face and ribs.

    violationRecord 5192667
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5192666
    No 4 Mine · 0101247

    30 CFR 75.400 · $465.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 5192665
    No 4 Mine · 0101247

    30 CFR 75.360(g) · $151.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F027161
    No 4 Mine · 0101247

    103(i) · 9.5 on-site hours reported

  23. Machinery and equipment; operation and maintenance.

    violationRecord 5192664
    No 4 Mine · 0101247

    30 CFR 75.1725(a) · $288.00 proposed penalty

  24. Machinery and equipment; operation and maintenance.

    violationRecord 5192663
    No 4 Mine · 0101247

    30 CFR 75.1725(a) · $288.00 proposed penalty

  25. Preshift examination at fixed intervals.

    violationRecord 5192662
    No 4 Mine · 0101247

    30 CFR 75.360(g) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.