Warrior Met Coal Mining, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
No 4 Mine · 010124730 CFR 75.503 · Significant and substantial (S&S) · $5,144.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Spot Inspections
No 4 Mine · 0101247103(i) · 9.3 on-site hours reported
Accumulation of combustible materials.
No 4 Mine · 010124730 CFR 75.400 · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
No 4 Mine · 010124730 CFR 75.370(a)(1) · $313.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · $465.00 proposed penalty
Condition and examination of firefighting equipment.
No 4 Mine · 010124730 CFR 75.1100-3 · $267.00 proposed penalty
Maintenance of diesel-powered equipment.
No 7 Mine · 010140130 CFR 75.1914(h)(1) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 7 Mine · 010140130 CFR 75.403 · $313.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 7 Mine · 010140130 CFR 75.403 · $313.00 proposed penalty
Spot Inspections
No 7 Mine · 0101401103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $818.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Roof control plan.
No 7 Mine · 010140130 CFR 75.220(a)(1) · $366.00 proposed penalty
Spot Inspections
No 4 Mine · 0101247103(i) · 6.0 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
No 4 Mine · 010124730 CFR 77.1606(c) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Identification of circuit breakers.
No 4 Mine · 010124730 CFR 75.904 · $245.00 proposed penalty
Short circuit protection of trailing cables.
No 4 Mine · 010124730 CFR 75.601 · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
No 4 Mine · 010124730 CFR 75.1731(a) · $267.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · $465.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
No 4 Mine · 010124730 CFR 75.1731(b) · $245.00 proposed penalty
Accumulation of combustible materials.
No 4 Mine · 010124730 CFR 75.400 · $465.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 4 Mine · 010124730 CFR 75.403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
No 4 Mine · 010124730 CFR 75.403 · $288.00 proposed penalty
Weekly examination.
No 4 Mine · 010124730 CFR 75.364(g) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.