← Warrior Met Coal Mining, LLC

Warrior Met Coal Mining, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F02F31F
    No 7 Mine · 0101401

    10.5 on-site hours reported

  2. Mechanical equipment guards.

    violationRecord 5192077
    No 7 Mine · 0101401

    30 CFR 77.400(a) · $151.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F03E4A0
    No 4 Mine · 0101247

    103(i) · 9.0 on-site hours reported

  4. Spot Inspections

    inspectionRecord F02407D
    No 7 Mine · 0101401

    103(i) · 7.5 on-site hours reported

  5. Protection from falls of roof, face and ribs.

    violationRecord 5191483
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5191482
    No 4 Mine · 0101247

    30 CFR 75.400 · $465.00 proposed penalty

  7. Maintenance of diesel-powered equipment.

    violationRecord 9757563
    No 7 Mine · 0101401

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5192230
    No 7 Mine · 0101401

    30 CFR 75.400 · $336.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5191316
    No 7 Mine · 0101401

    30 CFR 75.400 · $366.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5191481
    No 4 Mine · 0101247

    30 CFR 75.202(a) · $504.00 proposed penalty

  11. Ventilation controls.

    violationRecord 5191480
    No 4 Mine · 0101247

    30 CFR 75.333(e)(1)(ii) · $592.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5063837
    No 4 Mine · 0101247

    30 CFR 75.202(a) · $504.00 proposed penalty

  13. Slip or fall of person

    accidentRecord 220262360004
    No 7 Mine · 0101401

    Days away from work only

    Accident narrative

    Employee was hanging cable around the P.C on 14 section, employee stepped in a rut beside the high voltage tub and rolled EE's left ankle. Fracture to left fibula

  14. Spot Inspections

    inspectionRecord F03E49F
    No 4 Mine · 0101247

    103(i) · 8.0 on-site hours reported

  15. Spot Inspections

    inspectionRecord F02F31E
    No 7 Mine · 0101401

    103(i) · 9.3 on-site hours reported

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5191315
    No 7 Mine · 0101401

    30 CFR 75.512 · Significant and substantial (S&S) · $959.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5191314
    No 7 Mine · 0101401

    30 CFR 75.400 · $336.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5191313
    No 7 Mine · 0101401

    30 CFR 75.400 · $336.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9757562
    No 7 Mine · 0101401

    30 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  20. Maintenance of diesel-powered equipment.

    violationRecord 5192229
    No 7 Mine · 0101401

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  21. Emergency tethers.

    violationRecord 5192228
    No 7 Mine · 0101401

    30 CFR 75.1714-6 · $151.00 proposed penalty

  22. Other safeguards.

    violationRecord 5191312
    No 7 Mine · 0101401

    30 CFR 75.1403 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5191479
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 9757561
    No 7 Mine · 0101401

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9757560
    No 7 Mine · 0101401

    30 CFR 75.400 · Significant and substantial (S&S) · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.